Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

41results about How to "Realize lean management" patented technology

Digitized coal yard system based on Internet of Things and artificial intelligence system

The invention provides a digitalized coal yard system based on Internet of Things and an artificial intelligence system, relates to the technical field of fuel management, digitalized factories and power generation, and particularly relates to a digitalized management system of a coal yard. The method is based on the Internet of Things. The invention discloses a digital coal yard system of an artificial intelligence system. Digitization and intelligentization of coal yard and fire coal data are achieved by means of an artificial intelligence system, coal quality test equipment and entrance detection equipment are combined by means of coal yard related equipment and an information acquisition intelligent terminal, fire coal digital management is achieved, a data reference basis is providedfor coal blending combustion and fire coal planning, and actual economic benefits are brought to enterprises. According to the invention, a management chain from entry to evaluation is required to beestablished, and closed-loop management of fuel is realized, so that a coal yard management platform and a coal-fired data center are provided on the basis of an overall scheme architecture, and digitalization, visualization and intelligentization of coal yard management of power generation enterprises are realized through construction of the coal yard management platform and the coal-fired data center.
Owner:天津市容创智行节能科技有限公司

Robustness optimization evaluating method for reference power grid considering load uncertainty

ActiveCN106940869AIdentify weak pointsClarify investment prioritiesForecastingDesign optimisation/simulationNODALDecision taking
The invention provides a robustness optimization evaluating method for a reference power grid considering the load uncertainty. The method comprises the following steps: giving the parameters to a current state power grid; forwardly prospecting the load prediction interval values for all periods in a time scale and the planned network candidate branch schemes for the coming years; according to the relationship between the reactance of the system branches and the node branches, forming a system node injection transfer factor matrix; considering the response mechanism of the system to the uncertainty, forming a system power transfer distribution factor matrix under the guidance of the generator participation factors; expressing the uncertainty amount of the interval load in the form of affine arithmetic; constructing an optimal model; processing the interval form constraint in the optimal model and transforming it into a linear programming model; and using the linear programming method to solve the optimal model to obtain the final transmission line capacity value. The method of the invention is capable of considering the actual condition of a current state power grid, which increases the accuracy for planning decisions and realizing the professional and refined management for power grid development.
Owner:RES INST OF ECONOMICS & TECH STATE GRID SHANDONG ELECTRIC POWER +1

Networked online inspection system for electric energy metering devices

PendingCN106443562ARealize networked online inspectionEasy to installElectrical measurementsTime markData acquisition
The invention discloses a networked online inspection system for electric energy metering devices. The networked online inspection system comprises data acquisition devices, a data concentration device and a background server, wherein the data acquisition devices and the data concentration device are deployed in an electric meter cabinet of a substation, and the background server is deployed at a metering center; the data acquisition devices are connected with electric energy meters correspondingly, acquire pulse signals of the electric energy meters and voltage U and current I which are connected to the front of the electric energy meters, and send sample value packets to the data concentration device; and the background server is deployed at the metering center and used for receiving time mark carrying information which is sent by the data concentration device, performing electric energy calculation on original voltage and current and comparing with an electric energy value corresponding to the pulse signals so as to realize networked online inspection for the electric energy metering devices. The system disclosed by the invention truly realizes network online inspection for the electric energy metering devices, the front end only requires to deploy the highly-integrated high-precision acquisition devices and the data concentration device, and a standard meter is not required to be installed; and the rear end only requires to deploy the server and does not need a digital or simulated electric energy meter calibration instrument, thereby realizing high-precision acquisition at the front end and networked inspection at the rear end.
Owner:千岳(西安)信息科技有限公司

Substation video monitoring system based on SIP and integrating GIS platform

The invention discloses a substation video monitoring system based on an SIP (Session Initiation Protocol) and integrating a GIS (Geographic Information System) platform, which comprises an upper video monitoring platform, a lower video monitoring platform, a lower GIS spatial information service platform and an upper GIS spatial information service platform, wherein the lower video monitoring platform comprises a lower communication server, a lower streaming media server, a lower map management server, front end encoding equipment and a plurality of cameras, and the upper video monitoring platform comprises an upper communication server, an upper streaming media server, an upper map management server and an upper video monitoring client. The substation video monitoring system with spatial information is established by integrating a video monitoring system, the upper GIS spatial information service platform and the lower GIS spatial information service platform, and static parameter information, dynamic operation information and a real-time monitoring frame are combined with a spatial relationship and position information, so that effective support is provided for production operation of an intelligent substation.
Owner:INFORMATION & TELECOMM COMPANY SICHUAN ELECTRIC POWER

Improved reference power grid evaluating method

ActiveCN106971239AScientific and precise investmentHigh precisionForecastingResourcesCapacity valuePower grid
The invention related to an improved reference power grid evaluating method. The improved reference power grid evaluating method comprises following steps of giving out a current power grid parameter and the load predicted value in each period within a forward time scale, and planning a network candidate branch scheme; constructing an optimization model which aims at minimizing the annual power generating cost and the annual power transmission cost and comprises a plurality of constraints; processing a mixed integer nonlinear constraint formula in the optimization model, converting the mixed integer nonlinear constraint formula into a mixed integer linear programming model, solving the optimization model by means of a mixed integer linear programming method, and obtaining a final power transmission line capacity value. The improved reference power grid evaluating method can be used for adaptability evaluation of the current power grid under the load level in the forward time scale to make weak links of the current power grid be clear, actual operation mode optimization of the power grid, power grid topological correction control under accident conditions, fluctuation conditions of safe wind power and load power are considered and are used for optimizing the power grid programming scheme, the accuracy of the planning decision is improved, and professional and lean management of power grid development is achieved.
Owner:RES INST OF ECONOMICS & TECH STATE GRID SHANDONG ELECTRIC POWER +1

Power failure information management system based on trouble call management system

The invention discloses a power failure information management system based on a trouble call management system, which includes a trouble call management system, a power transmission and distribution production management system, and a load control information system, wherein the trouble call management system is provided with a power failure information management module used for power failure information sheet management, power failure information distribution and power failure information statistics as per scheduled power failure information and information of power supply outage and ration; the power transmission and distribution production management system is used for outputting the scheduled power failure information to the trouble call management system; and the load control information system is used for outputting the information of power supply outage and ration to the trouble call management system. According to the invention, a unified power failure information management platform is provided for related personnel to share and distribute power failure information of all kinds in a unified manner, thereby reducing links and time for information transmission, improving the power line repair and information sharing capability of daily operation, and realizing the lean management; and reply to power failure and power recovery of various types such as scheduled outage and outage caused by failure can be quickly carried out, and cross-system and cross-department power failure integration and procedure coherence are realized, so that the quality of the service for users is improved.
Owner:STATE GRID CORP OF CHINA +1

Production order management system based on 5G network

The invention discloses a production order management system based on a 5G network, which comprises an enterprise management layer and a workshop production control layer, and is characterized in thatthe enterprise management layer converts a sales order into a production order and associates the production order with equipment, personnel and material data information stored in a data server so as to issue a task instruction to the workshop production control layer; the workshop production control layer collects real-time data of equipment, personnel and production, communicates with the enterprise management layer in real time through a 5G wireless network, receives an instruction and controls production; the order management server obtains the number, specification, quality and progressof produced products through the workshop production controller, compares the number, specification, quality and progress with a production order, judges whether a production task is completed or not, and correspondingly sends out production stopping, work order modifying, deviation correcting, personnel allocating and material adjusting instructions. According to the invention, the intelligent degree of enterprise management is improved, seamless connection between a production order and a workshop production plan is realized, and the effectiveness and scientificity of management are improved.
Owner:CHINA ALUMINUM INT ENG CORP +1

Active service and operation management and control unified platform for power distribution network in economic park

The method is suitable for an economic park power distribution network and provides an active service and operation management and control unified platform for a power distribution network in an economic park. The invention comprises a power distribution network active service and operation management system, the power distribution network active service and operation management system is connected with a big data cloud platform center through an electric signal, and the big data cloud platform center comprises a service interface layer, a data storage layer and a data extraction layer. The invention discloses an active service and operation management and control unified platform for a power distribution network in an economic park. The requirement of changing the traditional passive service into the active service is changed; active unified and centralized management and control of internal and external information, active unified and centralized monitoring of source network load panorama, active unified and centralized management and control of distribution network service, active unified and centralized allocation of power distribution resources and intelligent auxiliary decision-making of distribution network service are realized. The active service capability of three subjects of a power supply company, a power supply client and a government is improved, and the economicpark distribution network production efficiency benefit, the service efficiency benefit and the management level are comprehensively improved.
Owner:YUNCHENG POWER SUPPLY COMPANY OF STATE GRID SHANXI ELECTRIC POWER +2

Power grid line loss fine management method based on data mining

PendingCN113592220ASolve the imperfect line loss management assessmentSolve the problem that it is difficult to evaluate the status quo of line loss managementCharacter and pattern recognitionData miningManagement processPower grid
The invention discloses a power grid line loss fine management method based on data mining, and the method comprises the steps of dividing an evaluation system into four dimensions: planning, management, operation and technology, and carrying out the whole line loss management process; according to an index selection principle, selecting indexes, constructing a multi-dimensional line loss management evaluation index system, solving dimensions and index weights, formulating index scoring standards according to various specifications and index data conditions of a power grid, and then constructing a prefecture-level power grid multi-dimensional line loss management evaluation system. According to the invention, an analytic hierarchy process is adopted to select evaluation indexes with commonality and practicability, and a hierarchical closed-loop management and control mechanism for line loss collection management, professional management and evaluation indexes is formed, so that differences of different professional dimensions between different management subjects and in the same subject can be effectively found, the problems that current prefecture-level power grid line loss management assessment is imperfect, and the current line loss management situation is difficult to assess are solved, and procedural, standardized and lean management of line loss is achieved.
Owner:STATE GRID HEBEI ELECTRIC POWER CO LTD +1

Molten iron scheduling method and system based on steelmaking molten iron quality requirement

The invention discloses a molten iron scheduling method and system based on steelmaking molten iron quality requirements, and relates to the technical field of molten iron transportation. A steelmaking execution system formulates a molten iron demand plan including molten iron quality grade requirements, and the ironmaking execution system combines current inspection and test data of each blast furnace to generate current tapping actual performance; and the molten iron management and control platform obtains the current molten iron grade of each blast furnace according to the current tapping actual performance and the molten iron grade rule, selects the standard blast furnace number meeting the molten iron quality grade requirement according to the matching of the molten iron quality grade requirement and the current molten iron grade, and executes the transportation operation of the molten iron tank according to the standard blast furnace number and the molten iron transportation system. The molten iron transported to a steelmaking department meets the steelmaking requirement through the quality requirement of the molten iron, the transportation and molten iron treatment cost is reduced, refined and lean management of molten iron transportation operation is achieved, the hit rate of the molten iron and a steelmaking plan is increased, temperature drop is reduced, and the matching rate of the molten iron needed for steelmaking is increased.
Owner:JIANGSU JINHENG INFORMATION TECH CO LTD

Power construction site-based management and control method and system

PendingCN112598218AQuality under controlProgress under controlResourcesOther databases browsing/visualisationInformatizationControl system
The invention relates to the technical field of network power engineering management, and discloses a power construction site-based management and control system, which comprises a power treasure system. The power treasure system comprises market customers and a construction management module. The market customers comprise power grid owners and total subpackage units; the construction management module comprises a satisfaction management module, a personnel management module, a field management module, a quality management module, a safety management module, a progress management module and aperformance management module. The invention further discloses a working method of the management and control system based on the power construction site. According to the management and control method and system based on the electric power construction site, the management level is improved, the cost control is enhanced and the operation cooperation mode of information transparency, process simplification and action standardization is established by utilizing the management mode of Internet + electric power construction, and an informatization communication platform of construction enterprises and owner customers is established by utilizing the Internet technology. Better use prospects can be brought.
Owner:GUANGZHOU KETENG INFORMATION TECH

Intelligent automobile exhaust pipe detection apparatus

ActiveCN108303221AOvercome the drawbacks of detectionRealize real-time digital acquisitionDetection of fluid at leakage pointProduction lineElectrical conductor
The invention brings forward an intelligent automobile exhaust pipe detection apparatus, which includes a pedestal and multiple detection points. The detection points are fixed to the pedestal according to the three-dimensional structure of an exhaust pipe. The detection points include a U-shaped pedestal and a top movable device. The first end of the top movable device is hinged to the first endof the U-shaped pedestal. The second end of the top movable device is provided with two contacts, the two contacts are connected through a conductor, and insulating materials cover the contacts. The second end of the U-shaped pedestal is provided with two contacts that correspond to the second end of the top movable device. The U-shaped pedestal is provided with a communicating sensor, and the communicating sensor is connected with the two contacts on the second end of the U-shaped pedestal. The beneficial effects of the detection apparatus are that precise management of an exhaust pipe production line is realized through analysis of detection data, the production efficiency is improved, the product quality is increased while the production cost is reduced, and probabilities of unqualifiedproduct detection leakage are reduced.
Owner:重庆近江智信汽车零部件有限公司

Cloud desktop office method and system based on hierarchical decoupling

PendingCN112153101ARealize entity logic separationEasy to handleTransmissionSoftware engineeringWorking environment
The invention provides a cloud desktop office method and system based on hierarchical decoupling, and the method comprises the steps: S101, judging whether a user is a legal user or not according to the login information of the user, executing S0102 if the user is the legal user, and executing S103 if the user is not the legal user; S102, acquiring information of a terminal for transmitting the access request, judging whether the information meets a preset condition or not, if so, executing S104, and if not, executing S105; S103, refusing the access request; S104, acquiring the system snapshotof the user stored in the cloud, loading the office desktop according to the system snapshot, and making the system snapshot and updating the system snapshot of the cloud according to the informationof the terminal; S105, updating the system snapshot of the user stored in the cloud according to the information of the terminal, and loading the office desktop through the updated system snapshot. According to the invention, logic separation of a user and a terminal hardware entity is realized, the user can use own working environment on different terminals, the working efficiency and the company terminal fault processing and operation and maintenance management and control level are improved, and lean management is realized.
Owner:GUANGDONG POWER GRID CO LTD

An intelligent vehicle exhaust pipe detection device

ActiveCN108303221BOvercome the drawbacks of detectionRealize real-time digital acquisitionDetection of fluid at leakage pointProduction lineExhaust pipe
The invention brings forward an intelligent automobile exhaust pipe detection apparatus, which includes a pedestal and multiple detection points. The detection points are fixed to the pedestal according to the three-dimensional structure of an exhaust pipe. The detection points include a U-shaped pedestal and a top movable device. The first end of the top movable device is hinged to the first endof the U-shaped pedestal. The second end of the top movable device is provided with two contacts, the two contacts are connected through a conductor, and insulating materials cover the contacts. The second end of the U-shaped pedestal is provided with two contacts that correspond to the second end of the top movable device. The U-shaped pedestal is provided with a communicating sensor, and the communicating sensor is connected with the two contacts on the second end of the U-shaped pedestal. The beneficial effects of the detection apparatus are that precise management of an exhaust pipe production line is realized through analysis of detection data, the production efficiency is improved, the product quality is increased while the production cost is reduced, and probabilities of unqualifiedproduct detection leakage are reduced.
Owner:重庆近江智信汽车零部件有限公司

A panoramic state monitoring system for a converter station

In order to prompt the lean management level of a convertor station, to meet the requirements for intelligent operation management of the convertor station, to achieve the effective fusion of monitoring data of equipment and to improve the utilization rate of data, the invention provides a panoramic state monitoring system for the convertor station. The system comprises a data collection module; a data storage module; a data analysis processing module; and an application module. The system achieves the unified collection and uploading of on-line monitoring data of all scattered and isolated devices at the convertor station to a mass real-time / historical database through a state controller, carries out the effective fusion and correlation analysis of the on-line monitoring data of various devices, achieves the panoramic monitoring and multi-dimensional analysis of the states of the devices at the convertor station, is provided with a plurality of management and analysis programs in a preset manner, provides intelligent early warning, alarming and auxiliary decision making functions for a manager, has an intelligent management function, can achieve the unified and standard storage of monitoring data of the devices at the convertor station, and provides unified data access service for the outside.
Owner:STATE GRID CORP OF CHINA +1

Bus grounding fault processing method based on main and distribution integrated big data analysis

PendingCN114421423AOptimizing reasoningOptimize intelligent fault handlingInformation technology support systemArrangements resposive to fault currentSequence controlQuality of service
The invention provides a bus grounding fault processing method based on main and distribution integrated big data analysis, and the method comprises the following steps: recognizing a grounding fault through employing a multi-dimensional data intelligent alarm technology, if a power distribution automation system recognizes the grounding fault, processing the grounding fault based on an integrated sequence control system, and carrying out the processing of the grounding fault. Otherwise, identifying the ground fault by using a main and distribution intelligent alarm collaborative optimization technology, identifying the ground fault by using a power distribution network FA and intelligent alarm collaborative optimization technology, and processing the ground fault based on a power distribution network ring network alarm logical reasoning technology. According to the method, man-machine efficient interaction is utilized, the intelligent dispatching level of a power grid is improved more quickly and more efficiently with higher management force, higher innovation force and higher execution force, bus grounding fault handling is improved to 6 minutes from 30 minutes, and lean management is achieved. The main-distribution integrated technology is realized to support intelligent auxiliary decision making, and the accuracy of fault alarm and fault positioning is improved. The power recovery efficiency is effectively improved, the power supply service quality is improved, the manpower and material resource cost is saved, and resource optimization management is realized.
Owner:GUANGXI POWER GRID CO LTD NANNING POWER SUPPLY BUREAU

A system and method for dynamic identification of electrical network topology in a low-voltage distribution station area

The invention discloses a system and method for dynamic identification of the topology of a low-voltage distribution station area electrical network, which includes a station area identification terminal of a master, a branch identification terminal of a slave machine, and an end identification terminal of a slave machine; the station area identification terminal is installed in a transformer The outlet terminal is used for phase-separated real-time broadcasting of the station identification signal of the station identification terminal and the reception of the terminal identification signal of the terminal identification terminal; the branch identification terminal is installed at the branch end of the line and is used to receive the station area of ​​the station identification terminal in real time The identification signal and the terminal identification signal of the terminal identification terminal; the terminal identification terminal is installed at the end of the meter box, and is used to receive the station area identification signal of the station area identification terminal and send the terminal identification signal of the terminal identification terminal in real time. The invention can efficiently and accurately establish the topological relationship among distribution transformer-line-household, provide household-transformer relationship for fast fault location of low-voltage line, and improve distribution network operation and maintenance management level and power supply reliability of distribution network.
Owner:NARI NANJING CONTROL SYST +3

An Engineering Supervision and Management System

The present invention is applicable to the field of computer application technology, and provides a project supervision and management system, including: a whole-area management and control terminal, a partition management and control terminal, a departmental management and control terminal and a server, and the whole-area management and control terminal obtains project deletion or new information through the project management and control module , and send the deleted or newly created information to the control module of the server, the control module makes the database module delete or create new project information; the project statistics module counts the project information in the database, and forwards the project statistics results to the project overview of the district management and control terminal through the control module module; the department management and control terminal obtains the project query request through the project query module, and sends the project query request to the database module through the control module of the server, and the database module returns the project information query module through the control module. The invention realizes the automation of the technical supervision process, can improve the quality and efficiency of the technical supervision, and realizes lean management of the technical supervision.
Owner:STATE GRID CORP OF CHINA +1

An improved reference grid evaluation method

ActiveCN106971239BScientific and precise investmentHigh precisionForecastingResourcesControl theoryLoad following power plant
The invention related to an improved reference power grid evaluating method. The improved reference power grid evaluating method comprises following steps of giving out a current power grid parameter and the load predicted value in each period within a forward time scale, and planning a network candidate branch scheme; constructing an optimization model which aims at minimizing the annual power generating cost and the annual power transmission cost and comprises a plurality of constraints; processing a mixed integer nonlinear constraint formula in the optimization model, converting the mixed integer nonlinear constraint formula into a mixed integer linear programming model, solving the optimization model by means of a mixed integer linear programming method, and obtaining a final power transmission line capacity value. The improved reference power grid evaluating method can be used for adaptability evaluation of the current power grid under the load level in the forward time scale to make weak links of the current power grid be clear, actual operation mode optimization of the power grid, power grid topological correction control under accident conditions, fluctuation conditions of safe wind power and load power are considered and are used for optimizing the power grid programming scheme, the accuracy of the planning decision is improved, and professional and lean management of power grid development is achieved.
Owner:RES INST OF ECONOMICS & TECH STATE GRID SHANDONG ELECTRIC POWER +1

Power cable joint manufacturing quality detection device and method

The invention provides a power cable joint manufacturing quality detection device and method. The device comprises a detection device which is used for collecting a power cable joint image or video through a machine vision technology, an environmental parameter monitoring device which is used for monitoring the manufacturing environment of the power cable joint, a power cable joint ID identification device which is used for automatically identifying the ID of the power cable joint, and a control mechanism which is used for acquiring the collected image or video, monitored environment parameters and data of power cable joint ID identification, processing, calculating, statistically analyzing and storing the data, and finally obtaining a detection result and generating a detection report; the control mechanism is in signal connection with the detection device, the environmental parameter monitoring device and the power cable connector ID identification device. According to the detection device and method of the invention, the manufacturing quality of the power cable joint can be rapidly and reliably detected, and the problem of cable faults caused by the manufacturing quality of the power cable joint is effectively solved, so that the manufacturing quality of the power cable joint is improved.
Owner:佛山光之瞳电子科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products