Construction progress recommendation method and device, computer equipment and readable storage medium

A technology of construction schedule and recommended method, applied in the direction of calculation, office automation, instruments, etc., can solve the problems of unfavorable project progress unified and standardized management, error-prone, low reliability, etc., and achieve the effect of rapid construction schedule arrangement

Pending Publication Date: 2021-04-09
GLODON CO LTD
View PDF0 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

But in fact, manual design is more or less subjective and one-sided, which is not conducive to the unified and standardized management of project progress, and has low reliability and error-prone

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction progress recommendation method and device, computer equipment and readable storage medium
  • Construction progress recommendation method and device, computer equipment and readable storage medium
  • Construction progress recommendation method and device, computer equipment and readable storage medium

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0042] see figure 1 , this embodiment proposes a construction schedule recommendation method, including the following steps:

[0043] S100: Obtain the first task name input by the user, where the first task name is a task name customized by the user according to the progress of the current task.

[0044] Construction progress refers to the various task stages that need to be experienced to complete a project, and each task stage has its own task name. For example, the completion of project 1 requires three task stages, namely task stage 1, task stage 2, and task stage 3. The relationship between task stage 1, task stage 2 and task stage 3 is progressive over time, that is, the next step after completing task stage 1 needs to complete task stage 2, and the next step after completing task stage 2 needs to complete task stage 3. Each task stage corresponds to a task name, for example, task stage 1 corresponds to task name 1, task stage 2 corresponds to task name 2, and task sta...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a construction progress recommendation method and device, computer equipment and a readable storage medium, and the method comprises the following steps: obtaining a first task name input by a user, the first task name being a task name customized by the user according to the current task progress; determining a standard task name according to the first task name, wherein the standard task name is a preset task name corresponding to the first task name; obtaining a subordinate task name corresponding to the standard task name, wherein the subordinate task name is a preset task name of the next task progress of the current task progress; and recommending the subordinate task name to the user, and adjusting a recommendation weight value of the subordinate task name according to a return value of the user.

Description

technical field [0001] The invention relates to the technical field of construction progress management, in particular to a construction progress recommendation method and recommendation device. Background technique [0002] In the process of building construction, the design and arrangement of the schedule plan is a very important link. Reasonable planning and arrangement can avoid rework operations, speed up construction progress, ensure construction quality, and improve construction efficiency. At present, most of the arrangements for the construction schedule are manually designed, which requires engineers to have rich engineering experience, be able to coordinate the overall situation, effectively allocate engineering resources, and arrange each task reasonably. But in fact, manual design is more or less subjective and one-sided, which is not conducive to the unified and standardized management of project progress, and has low reliability and is prone to errors. There...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/10G06F40/289G06F40/211G06F16/31
CPCG06Q10/103G06F16/322G06F40/211G06F40/289
Inventor 陈静张亚军
Owner GLODON CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products