Construction method for adjacent deep foundation pits close to tramcar
A technology for trams and construction methods, applied in infrastructure engineering, excavation, construction, etc., can solve problems such as large waste of manpower, materials, and machines, long construction period span, and high pressure on project cost control
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0032] The invention discloses one.
[0033] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0034] see Figure 1-5 .
[0035] The invention discloses a construction method for an adjacent deep foundation pit adjacent to a tram, comprising the steps of:
[0036] 1) Staggered excavation of two adjacent deep foundation pits;
[0037] 2) Carry out foundation pit protection for two adjacent deep foundation pits.
[0038] The construction method of the adjacent deep foundation pits close to the tramway disclosed in...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com