Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

37results about How to "Guaranteed settlement" patented technology

Pyrolysis-gasification integrated conversion and utilization system and method for waste biomass resources

The invention relates to a pyrolysis-gasification integrated conversion and utilization system for waste biomass resources and a method used by the same. The system comprises a pyrolysis device, a gas feeder, a multifunctional heat exchange device and a waste heat supply device, wherein a gas channel of the multifunctional heat exchange device is respectively connected with the pyrolysis device and the gas feeder, and a condensed water channel is connected with the waste heat supply device. The method comprises the following steps: delivering the raw material biomass waste into the pyrolysis device for high temperature pyrolysis to obtain mixed gas containing combustible gas, tar gas, acetic acid gas and water vapor; and introducing the mixed gas into the multifunctional heat exchange device for heat exchange and separating combustion gas from mixed liquor of tar and acetic acid after heat exchange, wherein hot water is obtained, hot water and combustion gas are respectively utilized by the waste heat supply device and the gas feeder to supply gas, heat and hot water for residents, acetic acid can be used as a biological foliar fertilizer, a biopesticide or a biological bactericide, and tar can be used as an industrial raw material. The integrated conversion, collection and utilization rate of the waste biomass resources approaches 100%.
Owner:LUOYANG JUNTENG ENERGY TECH

Growth-promoting and insect-prevention amino acid water-soluble fertilizer and preparation method thereof

The invention discloses growth-promoting and insect-prevention amino acid water-soluble fertilizer. The growth-promoting and insect-prevention amino acid water-soluble fertilizer is prepared from thefollowing raw materials in parts by weight: 10 to 18 parts of molasses, 35 to 65 parts of amino acid mother liquid, 2 to 15 parts of a biogenic insect-repelling agent, 5 to 10 parts of an emulsifyingdispersant and 10 to 30 parts of a nitrogen phosphorus potassium raw material. The amino acid water-soluble fertilizer disclosed by the invention can be used for effectively preventing and treating common aboveground insects including aphids, giant worms, adoxophyes cyrtosema meyrick, thrips and the like which are common in facility production; the growth of roots of crops can be promoted by adopting a drip irrigation and near-root fertilizer application manner; organic active substances of the amino acid and the molasses in the product can be used for buffering and adjusting an edaphone community and physicochemical properties and the dual aims of efficient utilization of nutrients and healthy growth of the crops are realized; a foundation is laid for improving the quality of fruits of the crops and improving the stress resistance of the crops; meanwhile, the utilization of pesticide and chemical fertilizer is reduced and the fertilizer has good ecological benefits.
Owner:CHINA AGRI UNIV

Construction method for additionally building high-speed railway roadbed in parallel with existing high-speed railway

PendingCN113235341ADoes not affect settlementMeet functional usage requirementsRoadwaysClimate change adaptationArchitectural engineeringSubgrade
The invention provides a construction method for additionally building a high-speed railway roadbed in parallel with an existing high-speed railway. The method comprises the steps of arranging a lengthened cast-in-situ bored pile at the slope toe of a side slope of the existing high-speed railway roadbed; after the cast-in-situ bored piles reach certain strength, arranging prestressed pipe piles in the subgrade foundation range of the newly-built high-speed railway; removing the slope surface protection of the existing high-speed railway roadbed slope, and digging a large step; pouring a concrete cushion layer on the top of the prestressed pipe pile, laying an impermeable layer, and pouring foam light soil; and constructing roadbed slope protection. Under the condition that the existing high-speed railway with the speed of 350 km/h is parallel, the functional use requirements of the newly-built high-speed railway with the speed of 350 km/h can be met, the roadbed base stress diffusion of the newly-built high-speed railway does not influence the operation of the existing high-speed railway, and the roadbed settlement of the existing high-speed railway is not influenced; the stability of the newly-built roadbed and the existing roadbed, the settlement amount and the transverse displacement in the operation period meet the standard requirements, and the use function requirements of the newly-built roadbed and the existing roadbed are met.
Owner:CHINA RAILWAY LIUYUAN GRP CO LTD

Foundation treatment structure suitable for deep soft foundation with sandwiched thin bearing stratum and construction method

PendingCN111321751ASave engineering investmentSolve the large settlementBulkheads/pilesPipeBearing capacity
The invention belongs to the field of geotechnical engineering, and particularly relates to a foundation treatment structure suitable for a deep soft foundation with a sandwiched thin bearing stratumand a construction method. The foundation treatment structure comprises a raft, a mattress layer, pipe piles and stirring piles, wherein the mattress layer is arranged at the bottom of the raft and located at the top of an upper soft soil foundation layer; the pipe piles are arranged at intervals and arranged at the bottom of the mattress layer, and the lower ends of the pipe piles are located ina middle bearing stratum; and the stirring piles are arranged at intervals and arranged at the bottom of the mattress layer and located in the upper soft soil foundation layer. According to the foundation treatment structure suitable for the deep soft foundation with the sandwiched thin bearing stratum, the engineering investment is saved; and settlement of a composite foundation is reduced, the bearing capacity of the composite foundation is improved, and the problems that the foundation settlement is large, the foundation bearing capacity is low and the pipe piles are prone to piercing the middle bearing stratum when the pipe piles are located in the middle bearing stratum are solved.
Owner:CHINA RAILWAY ERYUAN ENG GRP CO LTD

Lumbar vertebrae intervertebral fusion machine

PendingCN107773331AProtective structureExpand the main support areaSpinal implantsTransforaminal approachLumbar vertebrae
The invention discloses a horizontal-expansion lumbar vertebrae intervertebral fusion machine which can achieve minimally invasive implantation and relates to the field of medical apparatus and instruments. The fusion machine comprises a fusion machine body and a movable part, the movable part is arranged to slide along an inner cavity of the fusion machine body, a blocking part is fixedly arranged at one end of the fusion machine body, and the blocking part is arranged to prevent the movable part from being separated from the fusion machine body. The upper side surface and the lower side surface of the fusion machine body are provided with rough patterns. The inner cavity is provided with a first hole which runs through the inner cavity up and down and/or a second hole which runs throughthe inner cavity front and back. According to the lumbar vertebrae intervertebral fusion machine, the three-dimensional scale of the fusion machine is small before the fusion machine is spread, the fusion machine can be horizontally spread and expanded after the fusion machine is invasively implanted into the intervertebral gap through the intervertebral hole admission passage, the large bone grafting bed area can be provided, the main body supporting area that the fusion machine is in contact with an end plate is also greatly increased compared with a traditional fusion machine, the good initial stability can be achieved, the intervertebral fusion rate can be further improved, and the fusion machine helps to effectively lower sedimentation of the fusion machine.
Owner:SHANGHAI NINTH PEOPLES HOSPITAL SHANGHAI JIAO TONG UNIV SCHOOL OF MEDICINE

Sediment cleaning device and cast-in-place pile hole with expanding head sediment cleaning method

The invention provides a sediment cleaning device and a cast-in-place pile hole sediment cleaning method with the expanding head. The device comprises a reverse pulp guide pipe, a first air supply guide pipe and a stirring mechanism, wherein one end of the reverse pulp guide pipe is open; the reverse pulp guide pipe is arranged in the pile hole, an output opening is formed in the closed end of thereverse pulp guide pipe, and a first preset distance is formed between the opening end of the reverse pulp guide pipe and the bottom of the pile hole, and the reverse pulp guide pipe is used for conveying slurry and sediment in the pile hole to the ground; the first air supply guide pipe is arranged at the closed end of the reverse pulp guide pipe in a penetrating mode and is partially arranged inside the reverse pulp guide pipe, and the first air supply guide pipe is used for conveying compressed air; and the stirring mechanism is at least partially arranged in the pile hole, the stirring mechanism is used for stirring slurry in the pile hole, and the slurry is used for driving the sediment to be conveyed into the grouting guide pipe. According to the sediment cleaning device and the cast-in-place pile hole sediment cleaning method with the expanding head, the purpose of cleaning the sediment in the pile hole can be effectively achieved, so that the sediment cleaning is further guaranteed, and meanwhile, the cleaning device is suitable for any pile hole., and can meet relevant design requirements.
Owner:CHINA MCC20 GRP CORP

Particle bed filtering and dust removing device

The invention discloses a particle bed filtering and dust removing device. The device comprises a casing, wherein a dust-containing air inlet is arranged at the top of the casing, a dust outlet is arranged at the bottom of the casing, at least two layers of particle bed filters are vertically arranged in the casing, a back blowing air settling chamber is formed inside, a gap between the inner wall of the casing and the peripheries of the particle bed filters serves as an airflow chamber, the back blowing air settling chamber penetrates through at least two layers of particle bed filters from the lowest layer, the back blowing air settling chamber communicates with the dust outlet, each particle bed filter which is not penetrated by the back blowing air settling chamber comprises at least one filter unit, each particle bed filter which is penetrated by the back blowing air settling chamber comprises at least two filter units distributed on two sides of the back blowing air settling chamber, the airflow chamber and the back blowing air settling chamber communicate with a dust-containing air vent port, and a first inertia separation air deflector forming an angle of 10-45 degrees with the vertical direction is arranged at the dust-containing air vent port in the back blowing air settling chamber. The device has the advantages that back blowing air flows downwards and settling and discharge of dust are effectively guaranteed.
Owner:NINGBO UNIV

Construction method of soft surrounding rock tunnel collapse cave foam concrete backfill structure

The invention relates to a construction method of a soft surrounding rock tunnel collapse cave foam concrete backfill structure. The construction method comprises the following steps of 1) conducting constructing and manufacturing; (2) excavating a manual hole digging pile; 3) binding a reinforcement cage; (4) bearing platform construction; 5) backfilling small karst caves at the bottom of the tunnel; (6) forming small waterless karst caves in the side wall of the tunnel; (7) conducting vault crack construction; (8) backfilling the tunnel vault small waterless karst cave; (9) constructing a pre-embedded steel frame of a supporting wall; (10) conducting supporting wall and lining construction; (11) conducting secondary lining construction; 12) conducting back pressure backfilling; and (13) conducting tunnel roadbed construction. The method has the beneficial effects that a retaining wall of the manual hole digging pile adopts an assembly type, and a water escape valve is arranged on the retaining wall, so that the water escape valve can be opened and closed at any time according to the water quantity around the hole, the safety in the hole digging construction process is ensured, and the construction efficiency can be improved by using the assembly type technology.
Owner:ZHEJIANG UNIV CITY COLLEGE

Construction method for controlling settlement convergence of shallow buried loess tunnel with high water level

The invention discloses a construction method for controlling settlement convergence of a shallow buried loess tunnel with a high water level. The construction method includes the following steps that(1) precipitation of a precipitation well is achieved; (2) the reserved deformation amount is determined; (3) the step height is determined; (4) upper step excavation and preliminary bracing are achieved; (5) an upper step false stull is applied; (6) one sides of middle steps are excavated, and preliminary bracing is achieved; (7) a middle step false stull is applied; (8) one sides of lower stepsare excavated, and preliminary bracing is achieved; (9) primary support closed-loop construction is achieved; (10) secondary lining invert arch pouring is achieved; and (11) pouring of secondary lining arch wall is achieved. According to the method, design is reasonable, economic and social benefits are obvious, energy saving and environmental protection can meet the standard requirements, the technology reaches the advanced level in China, the method is used for quick installation construction of large-span, cross-railway transit T-shaped steel box girders, and the good application and promotion value is achieved.
Owner:CHINA RAILWAY SIXTH GRP TAIYUAN RAILWAY CONSTR +1

Engine cooling system with sand strap and control method thereof

The invention discloses an engine cooling system with a sand trap. The engine cooling system comprises a cylinder body water jacket, a cylinder cover water jacket and a water pump. The cylinder body water jacket and the cylinder cover water jacket are connected. A water outlet of the cylinder cover water jacket is connected with a water inlet of a radiator through a thermostat. A water outlet of the radiator is connected with the cylinder body water jacket through a water pump. The sand trap is arranged between a pipeline between the water outlet of the cylinder cover water jacket and the water inlet of the thermostat. The upper end of the sand trap is communicated with the pipeline. When cooling liquid enters the pipeline, the cooling liquid containing cylinder cover type sand granule impurities enters the thermostat after passing through the sand trap, and vortex produced through the sand trap enables the cylinder cover type sand granule impurities in the cooling liquid to be deposited at the bottom of the sand trap; then, when an engine is maintained, the bottom of the sand trap is detached to be cleaned, and after cleaning is finished, the bottom of the sand trap is installed, and cooling liquid is added into the engine. The engine cooling system is low in energy consumption, easy and convenient to disassemble and maintain, simple in structure, low in cost and easy to maintain.
Owner:DONGFENG COMML VEHICLE CO LTD

Airport electric equipment intelligent management platform based on Internet of Things and airport intelligent system

The invention belongs to the technical field of airport operation guarantee, and particularly provides an airport electric equipment intelligent management platform based on the Internet of Things andan airport intelligent system. The airport electric equipment intelligent management platform based on the Internet of Things comprises an electrically driven vehicle data acquisition terminal, an electrically driven special equipment data acquisition terminal, a charging pile data acquisition terminal and an Internet of Things management terminal. The airport intelligent system comprises an electrically-driven vehicle, electrically-driven special equipment, a charging pile and the airport electric equipment intelligent management platform based on the Internet of Things. According to the invention, settlement of guarantee services is facilitated, an operation guarantee scheme is optimized, the management efficiency is improved, parameters influencing safe operation of the electric driveequipment can be monitored in real time, the safe operation level and the intelligent management level of an airport are improved, and the system has the characteristics of reliable operation, convenient use and high management efficiency.
Owner:高洪江

Construction method of underground diaphragm walls close to subways

InactiveCN111576393AAchieving settlement controlGuaranteed settlementBulkheads/pilesRebarRock bolt
The invention provides a construction method of underground diaphragm walls close to subways. The construction method comprises the steps that (1) composite anchor piles are used for reinforcing and protecting bridge piles and roadbeds of the adjacent subways; (2) surveying and setting out are conducted; (3) excavation is conducted at the positions of guide walls according to surveying and settingout positioning parameters, then plain concrete cushion layers are poured, and guide wall construction is conducted; (4) all the underground diaphragm walls on the same straight line section are divided according to groove sections, and framing groove jumping construction is conducted; (5) a reinforcement cage is hoisted, and guide pipe arrangement and concrete pouring are conducted; and (6) in the step (1) and the steps (3) - (5), the deformation conditions of the bridge piles and the roadbeds of the adjacent subways are monitored, an accumulated deformation curve is generated according to monitored data, and construction parameters in the step (1) and the steps (3) - (5) are adjusted in time according to the deformation conditions. Through the technical scheme provided by the invention,the problem that in the prior art, the underground diaphragm walls close to the subways cannot meet the construction requirements can be solved.
Owner:CHINA RAILWAY 14TH BUREAU GRP LARGE SHIELD ENG CO LTD +1

Foundation pit excavation and support method of shield starting shaft adjacent to subway

The invention provides a foundation pit excavation and support method of a shield starting shaft adjacent to a subway. The foundation pit excavation and support method of the shield starting shaft adjacent to the subway comprises the following steps: 1) using composite anchor piles to reinforce and protect elevated sections and subgrade sections of the adjacent subway to reduce the disturbance tothe ground caused by isolation pile construction; 2) performing enclosure structure construction, wherein the enclosure structure adopts a combination of underground continuous walls and jet groutingpiles, and the joint of two adjacent underground continuous walls are reinforced with a jet grouting pile to stop water; and 3) adopting a horizontal segmentation and vertical layered excavation method for excavation, setting the current excavation layer as the base layer, performing support construction on the base layer after the base layer excavation is completed, and excavating the next layerof the base layer after the support construction of the base layer is completed until the excavation of the foundation pit is completed. Through the technical scheme provided by the application, the problem that the foundation pit of the shield starting shaft adjacent to the subway in the prior art cannot meet the construction requirements can be solved.
Owner:CHINA RAILWAY 14TH BUREAU GRP LARGE SHIELD ENG CO LTD +1

Construction Method of Controlled Settlement Convergence for High Water Level Shallow Buried Loess Tunnel

The invention discloses a construction method for controlling settlement convergence of a shallow buried loess tunnel with a high water level. The construction method includes the following steps that(1) precipitation of a precipitation well is achieved; (2) the reserved deformation amount is determined; (3) the step height is determined; (4) upper step excavation and preliminary bracing are achieved; (5) an upper step false stull is applied; (6) one sides of middle steps are excavated, and preliminary bracing is achieved; (7) a middle step false stull is applied; (8) one sides of lower stepsare excavated, and preliminary bracing is achieved; (9) primary support closed-loop construction is achieved; (10) secondary lining invert arch pouring is achieved; and (11) pouring of secondary lining arch wall is achieved. According to the method, design is reasonable, economic and social benefits are obvious, energy saving and environmental protection can meet the standard requirements, the technology reaches the advanced level in China, the method is used for quick installation construction of large-span, cross-railway transit T-shaped steel box girders, and the good application and promotion value is achieved.
Owner:CHINA RAILWAY SIXTH GRP TAIYUAN RAILWAY CONSTR +1

A granular bed filter dust removal device

The invention discloses a particle bed filter and dust removal device, which comprises an outer shell, the top of which is provided with a dust-containing gas inlet, the bottom is provided with a dust discharge port, and the inside is provided with at least two layers of particle bed filters along the vertical direction. There is a back blowing gas settling chamber, the gap between the inner wall of the outer shell and the outer periphery of the particle bed filter is used as the air flow chamber, the back blowing gas settling chamber runs through at least two layers of particle bed filters from the lowest layer, the back blowing gas settling chamber and the The dust outlet is connected, and the particle bed filter that is not penetrated by the back blowing gas settling chamber includes at least one filter unit, and the particle bed filter that is penetrated by the back blowing gas settling chamber includes at least two filter units and is distributed in the back blowing gas settling chamber On both sides of the airflow chamber, the blowback gas settling chamber is connected with the dust-laden gas vent, and the dust-laden gas vent is provided in the blowback gas settling chamber with a first inertial separator at an angle of 10° to 45° from the vertical direction. Deflector; the advantage is that it can make the blowback air flow downward, effectively ensuring the dust to settle and discharge.
Owner:NINGBO UNIV

An engine cooling system with a grit chamber and its control method

The invention discloses an engine cooling system with a sand trap. The engine cooling system comprises a cylinder body water jacket, a cylinder cover water jacket and a water pump. The cylinder body water jacket and the cylinder cover water jacket are connected. A water outlet of the cylinder cover water jacket is connected with a water inlet of a radiator through a thermostat. A water outlet of the radiator is connected with the cylinder body water jacket through a water pump. The sand trap is arranged between a pipeline between the water outlet of the cylinder cover water jacket and the water inlet of the thermostat. The upper end of the sand trap is communicated with the pipeline. When cooling liquid enters the pipeline, the cooling liquid containing cylinder cover type sand granule impurities enters the thermostat after passing through the sand trap, and vortex produced through the sand trap enables the cylinder cover type sand granule impurities in the cooling liquid to be deposited at the bottom of the sand trap; then, when an engine is maintained, the bottom of the sand trap is detached to be cleaned, and after cleaning is finished, the bottom of the sand trap is installed, and cooling liquid is added into the engine. The engine cooling system is low in energy consumption, easy and convenient to disassemble and maintain, simple in structure, low in cost and easy to maintain.
Owner:DONGFENG COMML VEHICLE CO LTD

Goods taking device for unmanned supermarket and goods taking method

The invention provides a goods taking device for an unmanned supermarket and a goods taking method. The goods taking device comprises a bracket, a horizontal moving mechanism, a linear moving mechanism, a goods taking mechanism and a controller, wherein the linear moving mechanism is vertically arranged, the upper and lower ends thereof are in sliding connection with the bracket; the goods takingmechanism is in transmission connection with the linear moving mechanism; the linear moving mechanism drives the goods taking mechanism to move up and down; the horizontal moving mechanism is arrangedon the bracket, and is in transmission connection with the upper end and the lower end of the linear moving mechanism; the horizontal moving mechanism drives the linear moving mechanism and the goodstaking mechanism to move on the bracket; a moving track of the linear moving mechanism on the horizontal plane is annular; the horizontal moving mechanism, the linear moving mechanism and the goods taking mechanism are electrically connected with the controller; and the controller is in communication connection with a server side. The goods taking device for the unmanned supermarket and the goodstaking method provided by the invention guarantee that settlement of delivered goods is completed, shorten the goods taking time, and improve the goods taking efficiency.
Owner:武汉诺得佳科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products