Construction Method of Controlled Settlement Convergence for High Water Level Shallow Buried Loess Tunnel
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- CHINA RAILWAY SIXTH GRP TAIYUAN RAILWAY CONSTR
- Publication Date
- 2020-09-18
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention belongs to the field of tunnel building construction, in particular to a construction method for controlled subsidence and convergence of high-water-level shallow-buried loess tunnels, which is suitable for the construction of primary support arches in any form of underground excavation soil tunnels. Background technique
[0002] The vigorous development of underground engineering has largely alleviated the problem of surface land shortage. And with the continuous progress of the project, people's research on underground engineering has also entered a new stage. How to effectively control the settlement of tunnel construction is the difficulty of tunnel construction, especially for those high water level shallow buried loess tunnels. If the settlement cannot be effectively controlled, not only the construction quality will not be guaranteed, but also the danger of collapse will be faced at any time, which will affect the construction. ef...