Folding adjustable positioning and guiding device for tunnel excavation drilling and using method of folding adjustable positioning and guiding device
A positioning-oriented and foldable technology, applied in supporting devices, drilling equipment, directional drilling, etc., can solve the problems of affecting the effect of light explosion, difficulty in ensuring drilling accuracy, over-under-digging, etc., to reduce labor intensity and be beneficial to engineering. Cost control, control the effect of over-under-mining
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] Please refer to Figure 1~3 , the foldable adjustable tunnel excavation drilling positioning guide device provided by the present invention includes a support fixing device, a folding frame and multiple sets of adjustable drilling positioning guide sleeves, and multiple sets of adjustable drilling positioning guide sleeves set at intervals along the circumference of the folding frame;
[0041] The folding frame includes a symmetrically arranged left half and a right half, each of which includes a top arch section 1, a side arch section 2 and a bottom arch section 3 hinged sequentially from top to bottom, And the top arch section on the left half is connected with the top arch section pin on the right half, and the bottom arch section on the left half is connected with the bottom arch section pin on the right half. The cross-sectional features of the folding frame are matched, and there are multiple sets of adjustment holes 4 evenly distributed in an array along the cir...
Embodiment 2
[0046] Based on the foldable adjustable tunnel excavation drilling positioning guide device in embodiment 1, its use method includes the following steps:
[0047] S1. Sample rack installation: transport and assemble the arch sections of the folding sample rack in sections, first clean and level the tunnel floor, and place the bottom arch sections of the left half and right half near the tunnel surface 12 , and pin-join the corresponding ends of the two bottom arch sections, respectively hinge the side arch sections and the top arch sections on the bottom arch sections on the corresponding sides in sequence, then pin-join the corresponding ends of the two top arch sections, and then Support rods are installed between each arch section to make the foldable frame form a rigid structure;
[0048] S2. Alignment of the sample frame: According to the drilling position marked in advance on the tunnel, the adjustable fixed screw rod is used to level and align the folded sample frame, a...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com