Field construction project management method and device, medium and platform

A project management and field construction technology, applied in the Internet field, can solve problems such as low management efficiency, poor correlation, and inability to track the entire life cycle of field construction projects, so as to achieve the effect of enhancing correlation and ensuring efficient operation

Pending Publication Date: 2022-04-12
ISOFTSTONE INFORMATION TECHNOLOGY (GROUP) CO LTD
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] However, the existing technical schemes are poorly related to each stage in the field construction process, and cannot realize the tracking of the entire life cycle of the field construction project, and the management efficiency is low
At the same time, the field construction project lacks effective visual operation status display

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Field construction project management method and device, medium and platform
  • Field construction project management method and device, medium and platform
  • Field construction project management method and device, medium and platform

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0028] figure 1 It is a flow chart of the field construction project management method provided in Embodiment 1 of the present application. This embodiment is applicable to any field construction project management scenario. The method can be executed by the field construction project management device provided in the embodiment of the present application. The device can It is implemented by software and / or hardware, and can be integrated into the field construction project management platform.

[0029] Such as figure 1 As shown, the field construction project management method includes:

[0030] S110. Obtain a current process node of the field construction project; wherein, the process includes at least one of a planning node, an implementation node, and an operation and maintenance node.

[0031] This solution can be implemented by the field construction project management platform, which can include various types of terminals, such as client terminals used by customers, p...

Embodiment 2

[0060] Figure 2A It is a flow chart of the field construction project management method provided by Embodiment 2 of the present invention, and this embodiment is refined on the basis of the foregoing embodiments.

[0061] Such as Figure 2A As shown, the method of this embodiment specifically includes the following steps:

[0062] S210. Obtain a current process node of the field construction project; wherein, the process includes at least one of a planning node, an implementation node, and an operation and maintenance node.

[0063] S220. If the current process node is a planning node, acquire field construction demand information and site information of the field construction project.

[0064] S230. Construct a three-dimensional site model according to the site information.

[0065] S240. Determine a device placement scheme and a device connection topology according to the three-dimensional site model and the site construction requirement information.

[0066] Figure 2...

Embodiment 3

[0080] image 3 It is a schematic structural diagram of a field construction project management device provided by Embodiment 3 of the present invention. The device can execute the field construction project management method provided by any embodiment of the present invention, and has corresponding functional modules and beneficial effects for executing the method. Such as image 3 As shown, the device may include:

[0081] The current process node obtaining module 310 is used to obtain the current process node of the field construction project; wherein, the process includes at least one of a planning node, an implementation node, and an operation and maintenance node;

[0082] An information acquisition module 320, configured to acquire field construction demand information and site information of the field construction project if the current process node is a planning node;

[0083] A field construction data generating module 330, configured to determine field constructio...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The embodiment of the invention discloses a field construction project management method and device, a medium and a platform. The method comprises the following steps: acquiring a current process node of a field construction project; the process comprises at least one of a planning node, an implementation node and an operation and maintenance node; if the current process node is a planning node, acquiring site construction demand information and site information of the site construction project; determining site construction data according to the site construction demand information and the site information; and determining a field construction plan of the field construction project according to the field construction data. According to the technical scheme, targeted management can be performed on the field construction project by obtaining the current process node of the field construction project, so that full-life-cycle tracking and management of the field construction project are realized, the relevance of each stage of the field construction project is enhanced, and efficient operation of the field construction project is ensured.

Description

technical field [0001] The embodiments of the present application relate to the field of Internet technologies, and in particular to a field construction project management method, device, medium, and platform. Background technique [0002] Under normal circumstances, the whole process of site construction mainly includes three aspects of work, namely, the initial scheme design work, the mid-term site construction implementation work, and the later acceptance and operation and maintenance work. [0003] At present, different operation departments are responsible for each link of the existing field construction process. For example, the design staff first completes the scheme design work, then the construction personnel implement the field construction design plan, and then the operation and maintenance personnel maintain the field construction results. [0004] However, in the existing technical solutions, the correlation between each stage in the field construction process ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/10G06Q10/06G06T17/05G06T19/20G06F30/13
Inventor 高鹏雒冬梅赵云飞焦丹华郝强张静思龚轩
Owner ISOFTSTONE INFORMATION TECHNOLOGY (GROUP) CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products