Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Management and storage system for project cost documents

A document management and storage system technology, applied in data processing applications, text database indexing, special data processing applications, etc., can solve problems such as long accounting cycles, achieve good security, improve efficiency, and clear and scientific workflow

Pending Publication Date: 2022-05-27
创信工程咨询股份有限公司
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

But at present, there is a problem that the accounting cycle is too long in cost accounting, so a document management storage system for project cost is proposed to solve this problem

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Management and storage system for project cost documents

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0009] In order to make the purpose, technical solution and advantages of the present application clearer, the present application will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0010] In the following description, references to "one embodiment," "an embodiment," "an example," "example," etc. indicate that such described embodiment or example may include a particular feature, structure, characteristic, property, element, or limitations, but not every embodiment or example necessarily includes the specific feature, structure, characteristic, property, element or limitation. Additionally, repeated use of the phrase "according to one embodiment of the present application" does not necessarily refer to the same embodiment, although it may.

[0011] For simplicity, some technical features known to those skilled in the art are omitted from the following description.

[0012] According to an embodiment of the prese...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a document management and storage system for project cost. The system comprises a data transmission module, a data generation module and a data analysis module, a project establishment application module, an application module, a single-item data module, a process data module and a statistical rule module are arranged in the data generation module; and the data analysis module is internally provided with a cloud storage module, an information storage module, a financial accounting module, a project approval module, a project approval application module and an overproof data judgment module. The system can enable the working process of dynamic management of the construction cost to be clearer and more scientific, and greatly improves the efficiency of the whole process. According to the method and the system, the text information can be received and issued, the receiving and issuing can be recorded, and the filing and cloud storage of the document can be realized, so that the text information has better security.

Description

technical field [0001] The invention specifically relates to a file management and storage system for engineering cost. Background technique [0002] Engineering project management means that the enterprise engaged in engineering project management (hereinafter referred to as the engineering project management enterprise) is entrusted by the owner, according to the contract, on behalf of the owner to carry out the management and service of the whole process or several stages of the organization and implementation of the engineering project (some enterprises, Owning its own construction organization, constructing and managing its own engineering projects, also belongs to the scope of engineering project management, and the management method and process refer to engineering project enterprises). The engineering project management company does not directly sign contracts with the general contractor of the project or the survey, design, supply, construction and other enterprises...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/10G06F16/23G06Q50/08
CPCG06Q10/103G06F16/31G06Q50/08
Inventor 阳南牟斌康瑜杨冬梅韩小娟
Owner 创信工程咨询股份有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products