A technology for building construction and anti-falling, which is applied in building construction, processing of building materials, construction, etc. It can solve the problems of fragile anti-falling nets and falling of anti-falling nets, and achieve the effect of improving the buffering effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0023] refer to Figure 1 to Figure 4 , an anti-falling object device for building construction management, comprising a steel rod 1, and the steel rod 1 is provided with two groups;
[0024] Coarse fall prevention net 2;
[0025] The connection ring 3, the connection ring 3 is provided with two groups, the two groups of connection rings 3 are respectively sleeved on the outside of the two groups of steel rods 1, and the two groups of connection rings 3 are provided with a connection ring 3 for fixing the connection ring 3 on the steel rod 1 The fixed structure, the two sides of the thick anti-falling net 2 are respectively connected with two groups of connecting rings 3;
[0026] The bottoms of the two sets of connection rings 3 are provided with connecting structures, and the opposite sides of the two sets of connecting structures are connected with fine anti-drop nets 4 located below the coarse anti-drop nets 2. When the volume of the falling objects is large, the falling ...
Embodiment 2
[0034] refer to Figure 4 The two sides of the spring two 9 are provided with inclined spring three 21, and the spring three 21 is connected to the inner wall of the connecting block 5. When the spring two 9 expands and contracts, the spring three 21 is driven to expand and contract, and further buffering is completed.
[0035] Both inner walls of the connecting block 5 are provided with a chute 22, and a slider 23 is slidably connected in the chute 22. The top and bottom sides of the slider 23 are respectively provided with a spring four 24 and a spring five 25 which are connected with the chute 22. , the sliding block 23 slides in the chute 22, so that the spring four 24 and the spring five 25 both expand and contract, and the buffer effect is improved with the buffer.
[0036] The vertical rod 10 is provided with an airbag 20 connected to the inner wall of the top of the connection block 5, and the connection block 5 moves so that the airbag 20 follows the deformation, whic...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com