Rapid construction method of high-pressure water-rich fault zone of tunnel

A construction method and fault technology, applied in tunnels, tunnel linings, earthwork drilling and mining, etc., to achieve the effects of improving efficiency, strengthening construction organization, and reducing risks

Active Publication Date: 2010-08-11
CHINA RAILWAY 12TH BUREAU GRP
View PDF1 Cites 40 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In order to solve the problems of different construction methods for tunnels in high-pressure water-rich fault zones under the guida

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Rapid construction method of high-pressure water-rich fault zone of tunnel
  • Rapid construction method of high-pressure water-rich fault zone of tunnel
  • Rapid construction method of high-pressure water-rich fault zone of tunnel

Examples

Experimental program
Comparison scheme
Effect test

Example Embodiment

[0046] The following engineering examples are given to further illustrate the construction method of the present invention

[0047] 1. Introduction to the project, the F11 fault of the Qiyueshan Tunnel is exposed in the DK364+950~+180 section of the surface, and it develops in the hard soluble rock dominated by T1j4 dolomite and the soft non-ferrous rock dominated by T2b1 shale and mudstone containing calcareous components. At the junction of soluble rocks, the main fault zone in the tunnel range is DK365+110~+340, which is characterized by multi-phase, secondary structure development, complex lithological components, loose cementation, broken rock mass, and deterioration of rock and soil properties due to saturated water. .

[0048] The F11 fault is divided into the contact zone of the broken rock mass in the upper and lower walls and the broken and weak zone in the core, with well-developed structural fissures and strong water permeability. Rich in cement content. It is pr...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to the field of tunnel construction, in particular to a rapid construction method of a high-pressure water-rich fault zone of a tunnel, which solves a plurality of problems in the construction method of high-pressure water-rich fault zone tunnels under the guide of the traditional knowledge. A draining branch tunnel is additionally arranged between a main tunnel and a parallel heading, the water flow pressure of the hanging wall of a fault interface is reduced progressively, and a large amount of water is discharged from the main tunnel by adopting a guiding and non-clogging mode; when the water pressure of the main tunnel is reduced to 0.3-0.5MPa, an informationized tracking and accurate grouting method is used for grouting and reinforcing the main tunnel; and rapidly excavating and sealing technology is used for excavating the main tunnel and the parallel heading. The invention adopts the technology combining the water distribution and pressure reduction mode, the informationized tracking and accurate grouting method and the rapidly excavating and sealing technology for high-pressure water-rich shattered fault zones for the first time, breaks through the traditional concept that the water distribution and pressure reduction mode is opposite to the grouting and reinforcing construction method, solves the world-class problem of construction of the high-pressure water-rich fault zone of the tunnel, improves the construction progress and the construction efficiency, and ensures safe and rapid perforation of the tunnel.

Description

technical field [0001] The invention relates to the field of tunnel construction, in particular to a rapid construction method for high-pressure water-rich faults in tunnels. Background technique [0002] Today, with the development of engineering construction, tunnel construction technology in complex areas has been greatly improved. At present, the construction methods for tunnels in high-pressure water-rich fault zones mainly include energy release and pressure reduction method and curtain grouting reinforcement method. In actual construction, it is found that these two methods have different problems. The specific analysis is as follows: 1. Energy release and reduction Problems in the pressure method: (1) For the case where there are underground rivers and karst development below the fault surface, and there are wide joint fissure waters in the vertical joint fissures, and the surface above the tunnel is houses, roads and paddy fields, the release of energy and pressure ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E21D9/00E21D9/14E21D11/04E21D20/00
Inventor 商崇伦张梅董裕国赵西民宋津喜和万春祁玺剑张金柱徐家定王晋雄吴波邱文恒席继红武亮月骆文学兰福东
Owner CHINA RAILWAY 12TH BUREAU GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products