Quick feedback analyzing system in tunnel constructing process
A tunnel construction and analysis system technology, which is applied in the field of analysis systems, can solve problems such as blindness in tunnel construction analysis and time-consuming numerical calculations, and achieve the effect of overcoming the slow calculation speed of models and the lack of modeling information
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0046] Combined below as Figure 1 to Figure 4 The present invention is described in detail:
[0047] a. Preliminary acquisition of geological parameters and tunnel construction parameters, according to the previous geological exploration information and rock classification, pre-estimate the range of geological and physical mechanical parameters of the tunnel to be built by looking up the table, and understand the currently adopted design and construction parameters. like figure 1 Steps A01 and A02 in the tunnel construction rapid feedback analysis system flow.
[0048] b. Establish a three-dimensional numerical model. According to the current construction parameters learned in step a, a three-dimensional finite element grid numerical calculation model for tunnel excavation is established on the computer. The numerical model is input by rock mechanics parameters: including the lateral pressure coefficient of surrounding rock, variable mode , Poisson's ratio, coefficient of f...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com