Quick feedback analyzing system in tunnel constructing process
A tunnel construction and analysis system technology, which is applied in the field of analysis systems, can solve problems such as blindness in tunnel construction analysis and time-consuming numerical calculations, and achieve the effect of overcoming the slow calculation speed of models and the lack of modeling information
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- Publication Date
- 2011-08-17
- Estimated Expiration
- Not applicable · inactive patent
Smart Images
Figure 1 Figure 2 Figure 3
Abstract
Description
technical field
[0001] The invention relates to a fast feedback analysis system for tunnel construction process. In particular, it involves an analysis system that combines digital camera image acquisition technology with computer intelligent analysis technology. Background technique
[0002] The geological body of tunnel engineering is complex and uncertain, and the pre-design scheme is very blind. The identification of the mechanical parameters of the surrounding rock by using the on-site monitoring information, that is, the back analysis method has been studied a lot, but most of these methods do not consider the influence of the support and anchor parameters, nor can they be effectively combined with the construction adjustment. The current construction plan adjustment is often based on experience and is affected by human factors, which affects the analysis accuracy.
[0003] The identification of surrounding rock parameters and the adjustment of construction schemes a...
Examples
Embodiment Construction
[0046] Combined below as Figure 1 to Figure 4 The present invention is described in detail:
[0047] a. Preliminary acquisition of geological parameters and tunnel construction parameters, according to the previous geological exploration information and rock classification, pre-estimate the range of geological and physical mechanical parameters of the tunnel to be built by looking up the table, and understand the currently adopted design and construction parameters. like figure 1 Steps A01 and A02 in the tunnel construction rapid feedback analysis system flow.
[0048] b. Establish a three-dimensional numerical model. According to the current construction parameters learned in step a, a three-dimensional finite element grid numerical calculation model for tunnel excavation is established on the computer. The numerical model is input by rock mechanics parameters: including the lateral pressure coefficient of surrounding rock, variable mode , Poisson's ratio, coefficient of f...