Method, system and terminal for randomly accessing terminal
A randomization and terminal technology, applied in the field of communication, can solve the problems of network deterioration, increase of network resource overhead, not small resource overhead, etc., and achieve the effect of protecting the network
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment 1
[0083] In a specific embodiment 1, the mobility management network element carries a randomization indication in the rejection response.
[0084] Figure 4 It is a schematic flow diagram of the mobility management network element MME rejecting the access of the MTC terminal and instructing it to randomly access after a delay time, with the following steps:
[0085] S401, the MTC UE requests to attach to the network;
[0086] S402, the eNodeB transmits the attach request of the MTC UE to the MME;
[0087]S403, the MME judges that the current network load is high or congestion has occurred, rejects the attach request of the MTCUE1, and returns an attach rejection response;
[0088] In the rejection response, the MME carries a delayed access time (Back off Time) determined according to the current network load and local policies, and the delayed access time is the same for all MTC terminals.
[0089] Further, the MME carries a randomization indication in the attach rejection r...
specific Embodiment 2
[0095] In the second specific embodiment, the wireless node carries a randomization indication in the rejection response.
[0096] Figure 5 It is a schematic flow diagram of rejecting the access of the MTC terminal for the wireless node and instructing it to randomly access after a delay time, with the following steps:
[0097] S501, the MME detects that the current load of the network is relatively high, or congestion has occurred;
[0098] S502. The MME sends a load control start message to the eNodeB. Through this message, the eNodeB knows that the current load of the core network is high, or congestion has occurred;
[0099] S503, the MTC UE requests to attach to the network;
[0100] S504, the eNodeB receives the attach request of the MTC UE, judges that the current network load is high or congestion has occurred, rejects the attach request of the MTC UE, and returns an attach rejection response;
[0101] In the rejection response, the eNodeB carries a delayed access...
specific Embodiment 3
[0105] In a third specific embodiment, the wireless node carries the randomization indication in the system broadcast.
[0106] Image 6 It is a schematic flow diagram of the wireless node notifying the terminal of the delay and random access through the system broadcast, and has the following steps:
[0107] S601, the MME detects that the current load of the network is relatively high, or congestion has occurred;
[0108] S602, the MME sends a load control start message to the eNodeB. Through this message, the eNodeB knows that the current load of the core network is high, or congestion has occurred;
[0109] S603. After receiving the load control start message sent by the MME, the eNodeB sends a system broadcast to notify the terminal that the current network load is high or congestion has occurred.
[0110] In the system broadcast, the eNodeB carries a delayed access time (Back off Time) determined according to the current network load situation and local policies, and t...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com