Development stage division method for power grid
A development stage, power grid technology, applied in the field of power grid development stage division based on reliability indicators, can solve problems such as failure to give accidents, achieve good computability, wide adaptability, and simple and clear methods and concepts.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0064] Power supply reliability refers to the ability of the power supply system to continuously supply power to users. The development process of power supply reliability can be roughly divided into four stages: the stage of low reliability level; the stage of rapid development of reliability level; the stage of steady growth of reliability level; and the stage of high reliability level. The development and changes of the four stages of power supply reliability are attached figure 1 shown.
[0065] 1) Low reliability level stage
[0066] The stage of low reliability level is the initial stage of power supply reliability development. The power supply reliability rate at this stage is generally below 99%, and the corresponding average user outage time is generally above 87.6h, and the annual power supply reliability rate index fluctuates greatly.
[0067] 2) Rapid development stage of reliability level
[0068] The reliability level of power supply is increasing rapidly, th...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com