Grouting reinforcement construction process capable of realizing draining and plugging combined effect for underground water in vertical shaft

A technology of combining dredging and grouting, which is applied in infrastructure engineering, drainage, safety devices, etc., can solve problems such as increasing construction difficulty, aggravating the diffusion and penetration of water layers, and increasing local water pressure, and achieves favorable environmental protection, The effect of reducing the amount of grouting and reducing the number of

Inactive Publication Date: 2013-05-08
BEIJING MUNICIPAL CONSTR
View PDF6 Cites 14 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In the shaft construction, it is often necessary to cross the geological layer of the aquifer. In the case that the face-to-face precipitation cannot be adopted, if the simple grouting plugging is easy to cause the local water pressure to increase, which directly aggravates the diffusion of the water layer to the grouting weak point The trend of penetration has virtually increased the difficulty of construction

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0009] The present invention is a grouting reinforcement construction technology combined with dredging and plugging of underground water in a vertical shaft, which includes the following process steps: (1), when the vertical shaft construction encounters groundwater, first temporarily seal the bottom of the vertical shaft, and set grouting pipes on both sides inside and outside the vertical shaft, and at the same time , with the arrangement of drain pipes. The grouting pipe is vertically inclined at 35°, and the drain pipe is vertically inclined at 22°. Both the grouting pipe and the drainage pipe are made of Φ32*3.5 drilled seamless steel pipes.

[0010] (2), dilute the water glass of the original slurry 39Be' to 28Be' with water, mix the TGRM grouting material and cement according to the ratio of 1:3, and mix the above two slurries 1:1 to make A liquid; mix the original slurry 39Be' Water glass is diluted with water to 30Be', concentrated phosphoric acid is diluted with wa...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a grouting reinforcement construction process capable of realizing a draining and plugging combined effect for underground water in a vertical shaft. The grouting reinforcement construction process includes steps of (1), temporarily sealing the bottom of the vertical shaft, arranging grouting pipes on inner and outer sides of the vertical shaft, arranging drain pipes matched with the grouting pipes on the vertical shaft and locally pumping the water by a vacuum pump; (2), diluting sodium silicate of raw grout 39Be' by water to obtain grout 28Be', mixing TGRM grouting materials with cement according to a proportion of 1:3 to obtain second grout, mixing the grout 28Be' with the second grout according to a proportion of 1:1 to obtain liquid A, diluting sodium silicate of raw grout 39Be' by water to obtain grout 30Be', diluting strong phosphoric acid by water according to a proportion of 1:6 to obtain diluted phosphoric acid, and mixing the grout 30Be' with the diluted phosphoric acid according to a proportion of 1:1 to obtain liquid B; (3), alternately filling the liquid A and the liquid B into reinforcement soil layers of the vertical shaft via the grouting pipes and completing grouting for the periphery of the vertical shaft; and (4), feeding small pipes within a 1.5m range of the periphery of the vertical shaft by the aid of high-pressure blast, and alternately filling the liquid A and the liquid B into the periphery of the vertical shaft via the small pipes. The grouting reinforcement construction process has the advantages that 'draining' and 'plugging' are combined and work along both lines in the grouting construction process for the vertical shaft, so that water layers are prevented from diffusing and permeating towards feeble grouted positions, the vertical shaft construction difficulty is lowered, and the construction safety degree is increased.

Description

【Technical field】 [0001] The invention relates to a building construction method, in particular to a grouting reinforcement construction technology combined with dredging and plugging of underground water in a vertical shaft. 【Background technique】 [0002] The success or failure of the grouting reinforcement construction technology combined with groundwater dredging and plugging in the shaft is related to the quality and safety of the entire project. In shaft construction, it is often necessary to pass through the geological layer of the aquifer. In the case where face-to-face precipitation cannot be adopted, if the simple grouting plugging is likely to cause local water pressure to increase, which directly aggravates the diffusion of the water layer to the weak grouting area. The trend of penetration has virtually increased the difficulty of construction. [0003] In order to solve the above technical problems, it is indeed necessary to provide a safe and reliable groutin...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E21F16/00E02D19/16E02D19/20
Inventor 朱玉明韩化龙胡嵩赵欣孟庆龙
Owner BEIJING MUNICIPAL CONSTR
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products