Construction method for preventing leakage of restroom tubular well
A construction method and toilet technology, applied in building components, building insulation materials, buildings, etc., can solve problems such as poor compactness, interference of residents, and influence on normal use of buildings, and achieve the effect of avoiding gaps
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0021] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0022] Such as figure 1 Shown, toilet tube well leakproof construction method of the present invention comprises the steps:
[0023] Step 1: Reserve a pipe hole at the floor of the toilet tube well, and install the standpipe 1 and the horizontal pipe (not shown in the figure); wherein, the specific position and size of the hole depends on the distribution of the standpipe, and the shape of the hole can be rectangular or square; Before the riser 1 is installed, the metal sleeve 2 welded with the water stop ring is set outside the riser, and the riser 1 and the metal sleeve 2 are installed together at the hole position, and temporary fixing measures are taken;
[0024] Step 2: Build a part of the filling wall 3 of the tube well, and install a drain pipe 4 connecting the inside and outside of the tube well on the filling wall 3; specifi...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com