A technology for underground engineering and road traffic, which is applied in water conservancy projects, infrastructure engineering, artificial islands, etc., can solve the problems of low excavation depth and low excavation speed, and achieve the effects of low engineering investment, shortened construction period, and low construction difficulty
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0048] Take the construction of an underground garage in a place with a narrow road and a large traffic volume, such as a railway station, as an example, the first scheme is adopted for construction:
[0049] (1) Divide the construction ground into three sections, namely section C in the middle and sections A and B on both sides
[0050] (2) Section C is closed, surrounded by retaining structures and pavement barriers, and traffic is diverted. Before excavation of the surface soil, two rows of pile foundation construction and steel lattice column construction are carried out. For the construction of Section C, the surface soil is excavated. Make the top plate 1 of section C; connect the top plate 1 of section C with two rows of steel lattice columns to form a reinforced concrete bridge;
[0051] (3) Restore the pipeline, backfill the soil of section C, restore traffic, construct section A, carry out steel sheet pile or bored pile construction, and use the surrounding beam to form the...
Embodiment 2
[0057] Take the construction in a place with wide roads and small traffic volume as an example, adopt the second construction plan:
[0058] (1) Divide the construction ground into three sections, namely section C in the middle and sections A and B on both sides
[0059] (2) Section C is closed, surrounded by retaining structures and pavement barriers, and traffic is diverted. Before excavation of the surface soil, two rows of pile foundation construction and steel lattice column construction are carried out. For the construction of Section C, the surface soil is excavated. Make the top plate 1 of section C; connect the top plate 1 of section C with two rows of steel lattice columns to form a reinforced concrete bridge;
[0060] (3) Restore pipelines, backfill section C earthwork, restore traffic, construct sections A and B at the same time, carry out steel sheet pile or bored pile construction, and make surrounding beams to form a foundation pit retaining structure, and then pile fo...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com