Medium and long term electricity purchase planning method capable of considering three-public-service-related consumption schedule and electricity purchase cost

A technology of electricity purchase cost and electricity purchase plan, applied in calculation, data processing application, forecasting, etc., can solve problems such as the complexity of the planning process, avoid high-level operation without considering system backup, avoid uneconomical low-level operation, The effect of reducing the cost of electricity purchase

Active Publication Date: 2014-04-23
STATE GRID CORP OF CHINA +2
View PDF6 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Due to various reasons, the on-grid electricity prices of different units are not the same, but the annual basic electricity plan is issued by the Economic and Trade Commission, and there is no linear relationship between the annual basic electricity plan of the unit and the on-grid electricity price
According to the goal of the lowest power purchase cost, units with low prices should generate more power, but the constraints of the three public demands often conflict with the power purchase cost. In addition, the planning needs to take into account the power balance of multiple months of the year, the total power consumption of all units Completion of the electricity status, etc., the planning process is complicated. In the actual mid-to-long-term planning process, it is difficult to meet the three public schedule requirements while also taking into account the optimization of power purchase costs.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Medium and long term electricity purchase planning method capable of considering three-public-service-related consumption schedule and electricity purchase cost
  • Medium and long term electricity purchase planning method capable of considering three-public-service-related consumption schedule and electricity purchase cost
  • Medium and long term electricity purchase planning method capable of considering three-public-service-related consumption schedule and electricity purchase cost

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0032] The specific implementation manner of the present invention will be described in further detail below according to the accompanying drawings.

[0033] The present invention provides a medium-to-long-term power purchase planning method that considers the three-community schedule and power purchase cost, solves the problem of the contradiction between the three-community schedule and the power purchase cost in the preparation of the mid-to-long-term power purchase plan, and makes the power purchase plan meet the requirements of the three-commitment schedule. To reduce the cost of electricity purchase as much as possible, the flow chart of the method is as follows figure 1 shown by figure 1 It can be seen that the method includes:

[0034] Step 1: Establish a three-way schedule constraint model. The three-way schedule deviation constraint model is to satisfy the deviation between the three-way schedule of each unit and the ideal three-way schedule within a given range.

...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a medium and long term electricity purchase planning method capable of considering a three-public-service-related consumption schedule and the electricity purchase cost. The method comprises the steps of 1, building a three-public-service-related consumption schedule constraint model which is capable of meeting the condition that the deviation between the three-public-service-related consumption schedule of each unit and an ideal three-public-service-related consumption schedule is in a given range; 2, building a production run constraint model of each unit; 3, considering different grid purchase prices of different units, building an electricity purchase cost objective function model of the units at a plurality of optimizing months, and calculating the value, meeting the three-public-service-related consumption schedule deviation constraint and the production run constraint, of the electricity purchase cost objective function model, wherein the electricity purchase cost objective function model enables the purchase cost of all units at the optimizing months to be minimum. By using the medium and long term electricity purchase planning method, the problem that the three-public-service-related consumption schedule contradicts with the electricity purchase cost in the medium and long term electricity purchase planning is solved, the electricity purchase plan meets the three-public-service-related consumption schedule requirements, and the electricity purchase cost is reduced as far as possible.

Description

technical field [0001] The invention relates to the field of electric power automation, in particular to a medium- and long-term power purchase planning method considering the progress of three projects and the cost of power purchase. Background technique [0002] At present, the preparation of medium- and long-term power generation plans in various provinces in my country must meet the three requirements, that is, the completion progress of the annual basic power generation of each unit is basically consistent. Due to various reasons, the on-grid electricity prices of different units are not the same, but the annual basic electricity plan is issued by the Economic and Trade Commission, and there is no linear relationship between the annual basic electricity plan of the unit and the on-grid electricity price. According to the goal of the lowest power purchase cost, units with low prices should generate more power, but the constraints of the three public demands often conflic...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/04G06Q50/06
Inventor 程海花杨争林耿建邵平郑亚先薛必克黄军高王高琴龙苏岩郭艳敏黄龙达徐骏黄春波吕建虎
Owner STATE GRID CORP OF CHINA
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products