Transport progress control method, device and system

A technology of schedule control and transportation speed, applied in the field of transportation schedule control of prefabricated components, can solve problems such as affecting the assembly progress, and achieve the effect of improving the construction progress

Inactive Publication Date: 2017-12-08
HEZHOU UNIV
View PDF4 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] In view of this, the purpose of the present invention is to provide a transportation progress control method, device and system, which can solve the problem that the assembly progress is affected by the accumulation of prefabricated components in the assembly site or the failure to assemble in time

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Transport progress control method, device and system
  • Transport progress control method, device and system
  • Transport progress control method, device and system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0045] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments It is only a part of embodiments of the present invention, but not all embodiments. The components of the embodiments of the invention generally described and illustrated in the figures herein may be arranged and designed in a variety of different configurations.

[0046] Accordingly, the following detailed description of the embodiments of the invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the a...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a transport progress control method, device and system, and relates to the technical field of prefabricated part transport progress control. The transport progress control method is applied to the prefabricated building which is assembled by multiple prefabricated parts. The method comprises the steps that the assembling progress of each prefabricated part in the assembling process is acquired; transport control information is generated according to the assembling progress and the preset assembling sequence of each prefabricated part; and the transport progress of the corresponding prefabricated parts is controlled according to the transport control information. With application of the method, the transport progress can be regulated and controlled according to the assembling progress so that the problems of early or delayed transporting of the prefabricated parts to the assembling place can be avoided, and the problems of influencing the assembling progress caused by the fact that the prefabricated parts are accumulated in the assembling place or cannot be assembled in time can be solved.

Description

technical field [0001] The present invention relates to the technical field of prefabricated component transportation schedule control, in particular, to a transportation schedule control method, device and system. Background technique [0002] Prefabricated buildings refer to buildings assembled on site with prefabricated components. The formation of buildings through prefabricated components generally includes at least three mutually independent processes, which are the manufacturing process, transportation process, and assembly process in chronological order. [0003] Although the above three processes are independent of each other, there is still a high degree of closeness in the process of building construction. Among them, the degree of connection between the transportation process and the assembly process will directly affect the progress of the assembly process, which in turn will affect the construction progress of the entire building. [0004] According to the re...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/08
CPCG06Q10/063116G06Q50/08
Inventor 于冬升胡琴张金团赵凯月蔡军
Owner HEZHOU UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products