Power marketing risk pre-warning method and system

A risk early warning and power marketing technology, applied in information technology support systems, data processing applications, instruments, etc., can solve problems such as large number of abnormal problems, heavy analysis workload, and large number of problems, so as to promote further improvement and speed up service Response and improve the effect of control

Inactive Publication Date: 2014-05-28
STATE GRID CORP OF CHINA +1
View PDF4 Cites 11 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At present, the marketing department of the power company analyzes and judges the number of suspected abnormal problems through the inspection and monitoring system, and completes the closed-loop management of abnormal problem handling through rectification. However, this process is the last layer of post-management after the problem occurs.
It caused a large number of problems, a large number of suspected abnormal problems, and a large analysis workload.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Power marketing risk pre-warning method and system
  • Power marketing risk pre-warning method and system
  • Power marketing risk pre-warning method and system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0049] Early warning of work link:

[0050] Through risk analysis, risk identification is carried out for the reply of the power supply plan under new installation, capacity increase and change of power consumption. The overdue reply of the power supply plan is divided into five links: business acceptance, survey and dispatch, on-site survey, plan approval, and plan reply. The specific information is as follows:

[0051]

[0052]After the risk identification work is completed, it enters the normalized monitoring and early warning process. The system applies the configured early warning indicators and thresholds of the risk link to realize online and real-time monitoring of the business acceptance time index of the "business acceptance" link of the risk of "power supply plan reply overdue". Automatic monitoring.

[0053]

[0054] When the early warning indicator reaches the threshold trigger condition, the system calculates the risk value according to the established ris...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a power marketing risk pre-warning method. The power marketing risk pre-warning method is characterized in that the power marketing risk pre-warning method comprises the following steps: the step S01: collecting business processing information of power marketing; the step S02: configuring risk indicators of the power marketing; the step S03: calculating out corresponding risk assessment values of the collected business processing information according to the risk indicators corresponding to risk models and with corresponding artificial neural networks being combined; and the step S04: grading the risk pre-warning based on the risk assessment values. For the disadvantages and deficiencies existed in a conventional power marketing checking and monitoring system as well as universality of the related field of the power marketing checking and monitoring system and complexity of the required technology, the power marketing risk pre-warning method and system are provided, so that professional and high-efficiency risk management of beforehand prevention and process tracking is realized.

Description

technical field [0001] The invention relates to the field of electric power marketing risks, in particular to a method and system for early warning of electric power marketing risks. Background technique [0002] As the State Grid Corporation of China continues to strengthen its marketing business management, the requirements for operators and managers at all levels are also getting higher and higher. At present, the marketing department of the power company analyzes and judges the number of suspected abnormal problems through the inspection and monitoring system, and completes the closed-loop management of abnormal problem handling through rectification. However, this process is the last layer of post-event management after the problem occurs. This caused a large number of problems, a large number of suspected abnormal problems, and a large analysis workload. Contents of the invention [0003] The purpose of the present invention is to provide a risk warning suitable for...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/06
CPCY04S10/50
Inventor 陈震亦陈红林莉莉叶靓
Owner STATE GRID CORP OF CHINA
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products