Cross-region wind power installed capacity coordinated planning method

An installed capacity, cross-regional technology, applied in the direction of wind power generation, single-network parallel feed arrangement, etc., can solve the problems of lack of planning guidance methods, no cross-regional wind power planning, etc., to reduce the demand for peak-shaving capacity and reduce output fluctuations Effect

Active Publication Date: 2014-09-03
STATE GRID CORP OF CHINA +1
View PDF3 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The current wind power planning methods generally carry out wind power planning in local areas according to the local wind power resources, lack of a unified planning guidance method, and do not carry out cross-regional wind power planning from the perspective of the overall situation, resulting in blindness and disorder

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Cross-region wind power installed capacity coordinated planning method
  • Cross-region wind power installed capacity coordinated planning method
  • Cross-region wind power installed capacity coordinated planning method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0021] In order to make the purpose, technical solutions and advantages of the present invention more clear, the present invention will be further described in detail below in conjunction with the accompanying drawings, accompanying tables and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.

[0022] In the embodiment of the present invention, the large-scale cross-regional wind power installed capacity coordinated planning method takes the wind power combination capacity factor as income and the wind power combination standard deviation as risk, and optimizes the proportion of wind power installed capacity in each region so that in a certain In the case of combined capacity factor, the standard deviation of wind power combination reaches the minimum, which effectively reduces the fluctuation of total wind power output and reduces the total peaking capacity deman...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a cross-region wind power installed capacity coordinated planning method which includes the steps of obtaining related data, constructing a calculation model, calculating a wind power combination effective frontier curve, determining a planning result and the like. According to the cross-region wind power installed capacity coordinated planning method, the wind power installed capacity of different regions is planned in a united mode based on an investment combination theory, wind power total contribution fluctuation is effectively reduced, and total peak pitching capacity demands of a system are reduced. The wind power installed capacity of the various regions under the condition that wind power combination quality factors are maximum serves as final optimized results, and the credibility of the wind power capacity and wind power fluctuation are considered to the maximum degree. The top limitation and the bottom limitation of the wind power installed capacity of the various regions are set, conditions, such as electric power network structures, load levels and government policies, of the various regions are sufficiently considered, and the planning result is close to the reality.

Description

technical field [0001] The invention belongs to the technical field of grid planning, and in particular relates to a coordinated planning method for cross-regional wind power installed capacity. Background technique [0002] With the continuous increase of national energy conservation and emission reduction efforts, wind power and other renewable energy power generation has developed rapidly. my country is building eight 10 million-kilowatt wind power bases in Jiuquan, Hami, Mengdong, Mengxi, Hebei, Jilin, Jiangsu, and Shandong. In addition, relevant departments are formulating plans for 10-million-kilowatt wind power bases in Heilongjiang and Shanxi, and the number of 10-million-kilowatt wind power bases in my country will increase from the current 8 to 10. The current wind power planning methods generally carry out wind power planning in local areas according to the local wind power resources, lack of a unified planning guidance method, and do not carry out cross-regional...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): H02J3/46
CPCY02E10/763Y02E10/76
Inventor 王魁闫大威宗志刚梁群李媛媛罗涛周进崔广胜刘丽霞雷铮
Owner STATE GRID CORP OF CHINA
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products