Construction method and structure of hydraulic core-wall rockfill dam without cofferdams
A rockfill dam and cofferdam-free technology, which is applied in the field of rockfill dam structure, achieves the effects of simplifying the construction process, reducing the pumping of the foundation pit, and saving the construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0022] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments.
[0023] Look figure 1 , the core wall rockfill dam structure without cofferdam of the present invention is a fine rockfill area 2 with an inverted triangle or trapezoidal structure located in the middle of the dam body and an equilateral triangle or trapezoidal structure symmetrically arranged upstream and downstream of the fine rockfill area 2 There is also a transitional rockfill area 3 between the fine rockfill area 2 and the mixed rockfill area 4 upstream and downstream, and a core anti-seepage layer 1 is provided in the middle of the fine rockfill area 2 A large rock slope protection area 5 is provided on the upstream slope of the mixed rockfill area 4 located on the upstream face.
[0024] Step 1: Fill the upstream and downstream mixed riprap area 4. During the construction, directly throw and fill the building excavation stones from th...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com