A method for adjusting real-time load in self-matching mode of water and thermal power working conditions in power grid
A real-time load, self-matching technology, applied in the direction of single-grid parallel feeding arrangement, etc., can solve the problem that the scheduling method is difficult to meet the working conditions requirements of cascade hydropower stations in different periods.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0102] A method for adjusting real-time loads in the self-matching mode of water and thermal power working conditions in the power grid. The method takes the Xiluodu-Xiangjiaba cascade hydropower station in the lower reaches of the Jinsha River as the research object (the Xiluodu-Xiangjiaba cascade power is mainly sent out through high-voltage direct current transmission lines. However, there will still be a certain amount of electricity to be supplied to the Sichuan power grid during the dry season; under normal circumstances, the power transmitted by the cascade through the high-voltage DC line is relatively stable, so the daily load fluctuation of the Xiluodu-Xiangjiaba cascade is mainly from the Sichuan power grid), and follow the steps below conduct:
[0103] Step 1: Calculate the difference ΔP between the real-time assigned load of the power grid and the planned load of the previous day, which is outside the output regulation dead zone of the cascade hydropower station, a...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com