End-to-end time delay guarantee transmission scheduling method oriented to industrial backhaul network

An industrial backhaul network and transmission scheduling technology, applied in the field of data communication, can solve the problems of inability to meet application requirements in the industrial field, poor end-to-end delay guarantee, and high network resource overhead.

Active Publication Date: 2015-06-24
SHENYANG INST OF AUTOMATION - CHINESE ACAD OF SCI
View PDF5 Cites 14 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, it is mostly implemented by reserving a large number of resources, and the network resource overhead is large; and there are p

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • End-to-end time delay guarantee transmission scheduling method oriented to industrial backhaul network
  • End-to-end time delay guarantee transmission scheduling method oriented to industrial backhaul network
  • End-to-end time delay guarantee transmission scheduling method oriented to industrial backhaul network

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0067] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments.

[0068] Below in conjunction with accompanying drawing and embodiment, content of the present invention is described in detail:

[0069] refer to figure 1 , the transmission scheduling method supporting end-to-end delay guarantee of the present invention includes two parts: a delay allocation process and a delay guaranteed forwarding process. The delay allocation process is implemented in the network manager 1, and the delay guaranteed forwarding process is implemented by the network switch 2 on the transmission path.

[0070] refer to figure 2 , the delay allocation process includes the following steps:

[0071] Step 1: Network exchange calculates the load of each link at regular intervals:

[0072] r i = C i C i...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses an end-to-end time delay guarantee transmission scheduling method oriented to an industrial backhaul network. The end-to-end time delay guarantee transmission scheduling method oriented to the industrial backhaul network comprises the two processes of a concentrated time delay distribution process and a segmented time delay guarantee forwarding process. The distribution method comprises the steps that a time delay distribution value of each segment link is calculated by a network manager according to time delay requests and transmission path loading conditions of a business flow, and the time delay requests and business header information are sent to network switches. The forwarding of data business is achieved by the network switches according to the time delay requests of specific business, wherein firstly, business data are placed in a corresponding delay priority buffer queue; then, the data in the time delay priority buffer queue are sent to a Crossbar switching matrix by the corresponding network switch through an experiment priority scheduling mechanism; finally, the timely transmission of the business in the corresponding buffer queue is guaranteed by the adoption of a Crossbar scheduling mechanism. According to the end-to-end time delay guarantee transmission scheduling method oriented to the industrial backhaul network, the fine-grained time delay control mechanism is adopted, so that the supportability and the determinacy of the business end-to-end time delay are improved.

Description

technical field [0001] The invention belongs to the technical field of data communication, and in particular relates to a transmission scheduling method supporting end-to-end delay guarantee. Background technique [0002] The industrial backhaul network is the product of the extension of the concept of the backhaul network to the industrial field. It refers to the transmission network between the industrial field network (such as the sensor network) and the WAN, and is mainly used for the access of industrial field data to the WAN. In the industrial environment, the delay sensitivity of different data is quite different, and some data are more sensitive to delay. Therefore, the industrial backhaul network needs to provide different end-to-end delay guarantees for its service data. [0003] DiffServ changes the "fair" and "best effort" service strategies of the network to a certain extent, and provides a service method that treats different services differently. Moreover, i...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): H04L12/851H04L12/937H04L12/875H04L47/56
Inventor 曾鹏于海斌李栋李志博王金涛
Owner SHENYANG INST OF AUTOMATION - CHINESE ACAD OF SCI
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products