Building dense region underground-space-building caisson construction method

A technology for underground spaces and dense areas, applied in buildings, caissons, infrastructure engineering, etc., to achieve the effects of easy disassembly and assembly, reduced damage and damage, and fast construction progress

Active Publication Date: 2015-09-09
山东轨道交通勘察设计院有限公司 +1
View PDF8 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002]With the improvement of people's living standards, private cars have entered thousands of households, which directly leads to difficulty in parking and serious congestion in old building-intensive areas without underground garages The occurrence and deterioration of the situation, in addition, random parking also has great potential safety hazards
The use of three-dimensional parking spaces on the ground has a certain mitigation effect, but it has shortcomings such as limited parking, difficult maintenance, short life cycle, poor environmental landscape, etc., and it is difficult to solve the problem fundamentally; therefore, appropriate construction methods are adopted for development and utilization according to the characteristics of various residential areas Underground space planning and construction of an underground garage is a once-and-for-all solution
[0003] Residential areas without simultaneous construction of underground garages have common characteristics such as narrow roads, small distances between buildings, complex underground environments around, and local ground building facilities. Under such environmental conditions, the conventional construction methods such as open cut, cover excavation, and underground excavation are difficult to give full play to their respective advantages, and cannot meet the technical requirements for the development and construction of underground garages.
CN103046570A discloses an unmanned pneumatic caisson construction method, which realizes excavation and soil dumping operations in an anhydrous environment, has a high degree of informatization, and has little impact on the surrounding environment, but the method is high in cost and takes up a large amount of ground space, so it is not applicable Development of Underground Space in Dense Areas of Old Buildings
CN101736749A discloses a continuous caisson construction method for soft soil foundations. The method carries out sinking construction for a plurality of individual caissons arranged continuously, and then combines the box sections of adjacent individual caissons into a whole. The construction period of the method is Short, it is more suitable for construction projects of subway stations in soft soil areas with limited construction period requirements. However, this method needs to change the covering soil of the entire underground space range, and is not suitable for the outside of the old building-intensive area with narrow space and local ground building facilities. environment

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Building dense region underground-space-building caisson construction method
  • Building dense region underground-space-building caisson construction method
  • Building dense region underground-space-building caisson construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0040] Step 1. Select the location of the terminal caisson. The location of the caisson should be selected on the ground with no auxiliary facilities and open space to minimize the impact on the surrounding life. The distance between adjacent rows of boxes d1, d2, d3, d4, d5 is Flexible selection of ground conditions;

[0041] Step 2: Construction preparation, construction fixed-point setting out, cleaning and leveling the construction site;

[0042] Step 3: Install high-pressure jet grouting piles along the excavation direction in the area adjacent to the underground space and surrounding buildings to retain soil and stop water; figure 1 shown in order to reduce the impact of underground excavation and unloading on the foundation of surrounding buildings;

[0043] Step 4: Construction of caissons and subsidence of excavated soil, the section diagram of caissons in the same row figure 2 As shown, the caisson body is constructed in sections and sinks in sections. In this pr...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention belongs to the technical field of underground architectural engineering, relates to a caisson construction method for developing an underground space at an old building dense region where an underground garage is not simultaneously built, and particularly relates to a building dense region underground-garage-building local caisson construction method. The method adopts interval caissons, an odd number of the caissons are disposed in the dense building group according to an adjacent building interval, a middle box body is sunk firstly, box bodies on two sides are symmetrically sunk then, and symmetrical forward tunneling is performed under protection of the caissons through the combination with a hidden digging method. The construction method can solve many problems of underground garage excavation construction in the building dense region well, and effectively eases a situation of a parking difficulty.

Description

Technical field: [0001] The invention belongs to the technical field of underground construction engineering, and relates to a caisson construction method for developing an underground space in an old building-intensive area where underground garages are not constructed synchronously, in particular to a local caisson construction method for building an underground garage in a building-intensive area. Background technique: [0002] With the improvement of people's living standards, private cars have entered thousands of households, which directly leads to the difficulty of parking in densely populated areas of old buildings without underground garages, and the occurrence and deterioration of serious congestion. Security risks. The use of three-dimensional parking spaces on the ground has a certain mitigation effect, but it has shortcomings such as limited parking, difficult maintenance, short life cycle, poor environmental landscape, etc., and it is difficult to solve the p...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02D23/00
Inventor 王国富路林海程少北
Owner 山东轨道交通勘察设计院有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products