Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Steel bar anchoring connection structure and connection method for precast fabricated concrete components

A prefabricated concrete and steel bar anchoring technology, applied in structural elements, building components, manufacturing tools, etc., can solve the problems of increased overlapping length of steel bars, increased amount of grouting materials, random construction operations, etc., to achieve small dimensions and enhanced bonding Good performance and connection effect

Inactive Publication Date: 2015-11-04
CHANGAN UNIV
View PDF6 Cites 10 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the existing reserved holes for anchorage of steel bars are reserved holes with smooth inner walls, and the bonding effect between the holes and the pouring mortar is poor, which increases the overlapping length of steel bars and increases the amount of grouting materials, resulting in poor economic benefits.
In addition, at present, there is no unified, standardized and specific construction method to follow when connecting prefabricated concrete structures. In actual construction, it is inevitable that the construction operations are relatively random, irregular, cumbersome, and the construction workers are low. Problems such as poor connection quality

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Steel bar anchoring connection structure and connection method for precast fabricated concrete components
  • Steel bar anchoring connection structure and connection method for precast fabricated concrete components
  • Steel bar anchoring connection structure and connection method for precast fabricated concrete components

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0052] Such as figure 1 The illustrated prefabricated concrete component anchorage connection structure includes a first prefabricated concrete component 7 and a second prefabricated concrete component 8 above the first prefabricated concrete component 7; figure 2 , the bottom of the second prefabricated concrete member 8 is provided with a steel bar anchoring reserved hole 6 for anchoring the first steel bar 9, and the first steel bar 9 is a pre-embedded steel bar embedded in the first prefabricated concrete member 7 and its The upper end protrudes to the outside of the first precast concrete member 7, and the upper end of the first steel bar 9 is inserted into the reserved hole 6 for anchoring the steel bar from bottom to top. A grouting structure 11 formed by grouting material is provided in the cavity between the steel bar anchoring reserved hole 6 and the first steel bar 9, and the first steel bar 9 is fastened and fixed to the steel bar anchoring reserved hole through t...

Embodiment 2

[0090] In this example, if Figure 7 As shown, the difference between the steel bar anchoring connection structure used and the embodiment 1 is that: the steel bar anchoring reserved hole 6 is provided with a spiral bar 13 , and the spiral bar 13 is coaxially sleeved on the first steel bar 9 .

[0091] In this embodiment, the rest of the structure of the steel bar anchorage connection structure is the same as that in Embodiment 1.

[0092] In this example, if Figure 8 As shown, the steel bar anchoring connection method adopted is different from that of Example 1 in that: before the second prefabricated concrete member is hoisted and the first steel bar is inserted in step 2, the spiral bar 13 is first set on the first steel bar 9; The hoisting equipment lifts the second precast concrete member 8 above the first precast concrete member 7, and lowers the second precast concrete member 8, so that the first steel bar 9 and the spiral bar 13 set outside it are inserted into the s...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
diameteraaaaaaaaaa
heightaaaaaaaaaa
compressive strengthaaaaaaaaaa
Login to View More

Abstract

The invention discloses a steel bar anchoring connection structure and connection method for precast fabricated concrete components. The steel bar anchoring connection structure comprises the first precast concrete component and the second precast concrete component located above the first precast concrete component, and the bottom of the second precast concrete component is provided with a steel bar anchoring preserved hole used for anchoring of a first steel bar pre-embedded in the first precast concrete component; a grouting structure is arranged in a cavity between the steel bar anchoring preserved hole and the first steel bar; the steel bar anchoring preserved hole is located on the outer side of the lower portion of a second steel bar laid out in the second precast concrete component, and multiple grooves are formed in the inner side wall of the steel bar anchoring preserved hole. The steel bar anchoring connection method comprises the first step of precasting of the second precast concrete component, the second step of hoisting of the second precast concrete component and inserting mounting of the first steel bar, the third step of grouting and the fourth step of maintenance. The steel bar anchoring connection structure and connection method for the precast fabricated concrete components are reasonable in design, convenient to achieve, good in use effect, capable of completing the steel bar connection process easily, conveniently and rapidly and reliable in connection.

Description

technical field [0001] The invention belongs to the technical field of construction of prefabricated assembled concrete components, and in particular relates to a reinforcement anchorage connection structure and connection method of prefabricated assembled concrete components. Background technique [0002] The development of construction industrialization is the fundamental transformation of the construction production mode from extensive production to intensive production, and it is the inevitable way and development direction of industrial modernization. The use of prefabricated concrete structures is an effective way to realize the industrialization of buildings. It is a concrete structure made of prefabricated concrete components as the main component, which is assembled, connected and partially cast in place. Foreign concrete prefabricated components and reinforced concrete started almost at the same time, but industrialized prefabricated concrete components in the mode...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E04B1/41E04C5/16B28B23/02B28B7/16
Inventor 吴涛刘喜陈旭邢国华刘伯权
Owner CHANGAN UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products