Construction method of oblique bottom plate in the connecting section with variable height difference in basement
A construction method and basement technology, applied to artificial islands, water conservancy projects, underwater structures, etc., can solve problems such as settlement cracks, large differences in structural design conditions, poor waterproof conditions, etc., and achieve the effect of improving stability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0026] In this embodiment, the steel structure welding process, bolt connection construction process, formwork setting process, and concrete pouring construction process will not be repeated in this implementation, and the embodiments of the structure related to the present invention will be focused on.
[0027] refer to figure 1 and figure 2 Shown, the present invention mainly comprises following construction steps:
[0028] 1) Installation of embedded parts: including the installation of the embedded screw 7 of the pile body, the embedded anchor bolt 8, the embedded screw 9 of the enclosure pile, the formwork tie reinforcement 10, and the embedded bolt 11;
[0029] 2) Construction of the cavity waterproof layer of the slanted slab 21: formwork is first set up on the outside of the cavity, and the construction sequence from the inside to the outside is geomembrane 15, concrete layer 14, slope protection layer 13, and the left end of tie bar 16 is implanted with surrounding ...