An intelligent management system and technology of construction projects, applied in the field of engineering construction project management, can solve the problems of complex information display and management, lack of pertinence and operability, and long time, so as to improve the efficiency of schedule management and cost management, Intuitive and simple display, the effect of reducing management costs

Pending Publication Date: 2016-02-24
吕曼
View PDF3 Cites 10 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] In order to solve the problem that in the existing intelligent management system of engineering construction projects, the information display and management of the project progress and project cost are complicated and not intuitive enough, and the operation is relatively complicated and cumbersome; The preparation of the schedule or the adjustment of the schedule is not pertinent and operable. Over-calculation, omission, over-variation and leakage of changes often occur in engineering measurement and changes. At the same time, the schedule and cost are still under preparation, reporting, review and approval. Problems that cannot be dealt with in a timely manner after a long period of time

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Intelligent management system for engineering construction project
  • Intelligent management system for engineering construction project
  • Intelligent management system for engineering construction project

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0073] The intelligent management system for engineering construction projects disclosed in the present invention will be explained in detail below. The intelligent management system of engineering construction projects disclosed in this example, such as Figure 13 , Figure 14 As shown, it includes a server 1 and several clients 2; the server 1 stores an engineering model 11, and the client 2 is provided with a functional module 21. The intelligent management system of this engineering construction project is oriented to all construction managers, such as construction units, owners, supervision units, industry management departments, etc.; Can perform corresponding operations within the scope of authorization.

[0074] The construction unit is the main body of the project construction, and is mainly responsible for the formulation of the construction plan, planning, organization and implementation, and self-inspection and control of progress, safety, quality, cost, and envi...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

In order to solve the problems that generally progress plan formulation or progress plan adjustment does not have pertinence and operability, phenomena of excess measurement, missing measurement, excess change and missing change frequently occur in engineering measurement and change, and formulation, reporting, examination and approval of plans and expenses consume long time and cannot be handled in time due to the fact that engineering progress and expense cannot be directly reflected on an engineering part in an existing intelligent management system for engineering construction, the invention provides an intelligent management system for an engineering construction project. The system comprises a server and a plurality of clients, wherein the server stores an engineering model; and each client is provided with an expense management module and a progress management module. According to the intelligent management system for the engineering construction project, provided by the invention, true, timely and accurate display and management of progress and measurement can be performed on the engineering model, so that the efficiency of progress and measurement management is greatly improved, paperless engineering construction management is truly realized, and management cost is greatly reduced.

Description

technical field [0001] The present invention relates to the field of engineering construction project management, and specifically includes engineering construction project management in the following fields: highway engineering, water transportation engineering, railway engineering, municipal engineering, housing construction engineering, water conservancy engineering and the like. Background technique [0002] Engineering construction has brought about earth-shaking changes in cities and rural areas, especially the development of expressways and high-speed railways, which has greatly shortened the distance between cities and people. The speed, convenience and comfort of highways and railways left a deep impression on people. However, the development and application of Internet technology has made human society more accessible and omnipotent. Under the current new situation of mass entrepreneurship and innovation, the application of Internet + makes life more convenient, i...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/06G06Q50/08
Inventor 吕曼吕柳明
Owner 吕曼
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products