Integrated disposing and eliminating method for construction site rubbish

A technology for construction sites and construction waste, which is applied in construction waste recycling, sustainable waste treatment, solid waste management, etc., and can solve problems such as dust, pollution, and construction waste.

Inactive Publication Date: 2016-11-23
BEIJING SHENZHOU BLUE SKY ENVIRONMENTAL PROTECTION TECH CO LTD
View PDF14 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The purpose of the present invention is to provide an integrated treatment and consumption method for construction site waste, which can process construction waste on the spot and solve the problems of land occupation, pollution and dust in the transportation process of construction waste

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Integrated disposing and eliminating method for construction site rubbish

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0019] The specific implementation method for realizing the integrated treatment and consumption method of construction site waste is as follows: a closed construction waste treatment workshop (1) is set up on the construction site, and a vertical garbage transportation pipeline (2) and an anti-shock safety net (2) are set in the waste treatment workshop 3), jaw crusher (4), conveyor belt (5), stone crusher (6), silo (7), mixer (8), brick making machine (9), plastic crusher (10), plastic granules machine (11), formwork four-sided saw (12), wood shredder (13), wood rod making machine (14), water medium vacuum cleaner (15), liquid-solid separation hydraulic machine (16); each building on the construction site A garbage vertical transportation pipeline (3) is provided to connect to the workshop, and an anti-shock safety net (3) is arranged below it, and the garbage on the construction site is transported to the garbage treatment workshop (1) in this way; in the garbage vertical tr...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides an integrated disposing and eliminating method for construction site rubbish. According to the method, a closed construction rubbish disposing workshop (1) is arranged on a construction site, and a vertical rubbish conveying pipeline (2), an anti-impact safety net (3), a jaw crusher (4), conveying belts (5), a stone crushing machine (6), a material bin (7), a stirring machine (8), a brick making machine (9), a plastic crushing machine (10), a plastic granulating machine (11), a formwork square-cutting saw (12), a timber crushing machine (13), a timber bar making machine (14), a water medium dust collector (15) and a liquid-solid separating hydraulic machine (16) are arranged inside the rubbish disposing workshop. The transportation amount can be reduced by more than 90% after the construction site rubbish is disposed through the method, raised dust generated in the vehicle transportation process is removed, environmental pollution is reduced, the construction rubbish is directly converted into wealth, and precious resources are saved.

Description

technical field [0001] The invention relates to the technical field of construction waste treatment and storage, in particular to a method for integrated treatment and storage of construction site waste. Background technique [0002] With the rapid development of the construction industry, construction waste has become an urgent problem to be solved. The total area of ​​my country's existing buildings is more than 40 billion square meters, and it is calculated based on the standard of 500 tons to 600 tons of construction waste generated during the construction process per 10,000 square meters. , my country's existing construction area has produced at least 2 billion tons of construction waste. Beijing produces about 40 million tons of construction waste every year. Most of these construction wastes are disposed of by landfill, which not only costs a lot of land acquisition, but also causes serious environmental pollution and a waste of resources. According to the estimates ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): B09B3/00B09B5/00C04B18/16
CPCY02W30/58Y02W30/78Y02W30/91
Inventor 薛胜利
Owner BEIJING SHENZHOU BLUE SKY ENVIRONMENTAL PROTECTION TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products