Railway roadbed construction progress management system and method based on 3DGIS and engineering 3D model

A technology of construction progress and railway subgrade, applied in the field of informatization, can solve the problems of low degree of automation of data collection, inconvenient progress display, inconvenient data statistical analysis, etc., to reduce input workload, reduce statistical analysis workload, The effect of reducing labor intensity

Inactive Publication Date: 2017-02-08
CHINA RAILWAY DESIGN GRP CO LTD
View PDF0 Cites 34 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At present, the display and management of my country's railway embankment construction progress mainly use reports and two-dimensional graphics. The standardization and automation of data collection in this way are

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Railway roadbed construction progress management system and method based on 3DGIS and engineering 3D model
  • Railway roadbed construction progress management system and method based on 3DGIS and engineering 3D model
  • Railway roadbed construction progress management system and method based on 3DGIS and engineering 3D model

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0041] The management system and management method of the present invention will be described in detail below in conjunction with the accompanying drawings.

[0042] Such as figure 1 As shown, the railway subgrade construction progress management system based on 3DGIS and engineering three-dimensional model of the present invention includes: user management module, actual progress data acquisition module, construction plan module, three-dimensional image progress display module, statistical analysis module and log record module.

[0043] The user management module is used for user login, logout, personnel management and authority configuration. in:

[0044]User login means that the user enters the user name and password to log in to the system. Illegal accounts cannot log in to the system. The system searches from the database user table according to the user name and password entered by the user. If the match is successful, the system is logged in;

[0045] Logout means tha...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a railway roadbed construction progress management system based on 3DGIS and an engineering 3D model. The system comprises a user management module, a practical progress data collection module, a construction group planning module, a 3D image progress display module, a statistical analysis module, a progress early-warning module and a log recording module; the practical progress data collection module has data filling, data checking and warehousing functions; the construction group planning module can make and record plans of a construction group of a construction site; the 3D image progress display module has 3D scene introduction, roadbed construction site model introduction, 3D roaming and progress display functions; the statistical analysis module can make statistical analysis on progress data and output a statistical report; the progress early warning module has early-warning staff configuring and short message prompting functions; and the log recording module can record user login information, progress filling information and checking information in real time. According to the invention, elaborate and 3D visualized management of the railway roadbed construction progress can be realized.

Description

technical field [0001] The invention belongs to the technical field of informationization of railway and urban rail transit construction, and in particular relates to a railway subgrade construction progress management system and management method based on 3DGIS and engineering three-dimensional models. Background technique [0002] The railway subgrade is the foundation of the track. It is a civil structure formed by excavation or filling. It is affected by many factors of the natural environment, and the construction is difficult and the construction period is long. How to ensure the construction quality of subgrade engineering, speed up the progress, and improve economic benefits are problems that project builders have been exploring and solving. At present, the display and management of my country's railway embankment construction progress mainly use reports and two-dimensional graphics. The standardization and automation of data collection in this way are low, the curre...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/06G06Q10/10G06Q50/08
CPCG06Q10/0637G06Q10/103G06Q50/08
Inventor 宁新稳韩祖杰王华赵文刘小龙范登科王娇黄漪
Owner CHINA RAILWAY DESIGN GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products