A construction method using pilot holes for guiding and positioning and smooth blasting
What is AI technical title?
AI technical title is built by PatSnap AI team. It summarizes the technical point description of the patent document.
A technology of guided positioning and smooth blasting, applied in blasting and other directions, can solve problems such as easy bending of eye holes, excessive error between holes, affecting blasting effect, etc. The effect of craftsmanship
What is AI technical title?
AI technical title is built by PatSnap AI team. It summarizes the technical point description of the patent document.
A technology of guided positioning and smooth blasting, applied in blasting and other directions, can solve problems such as easy bending of eye holes, excessive error between holes, affecting blasting effect, etc. The effect of craftsmanship
[0016] The principles and features of the present invention are described below, and the examples given are only used to explain the present invention, and are not intended to limit the scope of the present invention.
[0017] Using pilot hole-oriented positioning and smooth blasting construction methods, in the excavation of bedrock and bank slope rocks, diversion and drainage tunnels, and overflow tunnels in the Anlagou Reservoir, Wulatai Reservoir, and Liushugou Reservoir Project in Hami City be widely used.
[0018] For the diversion tunnel shaft project of the Anlagou Reservoir Project in Hami City, the blasting height of the rockwork is 20.82m, the geometric size of the shaft is 7.2m*9.2m, and the depth is relatively large, and the rock geology is complex, so a feasible construction plan must be adopted. Using the traditional blasting construction technology, it is bound to fail to control the quality after blasting.
[0019] In order to ensure the size and plane positi...
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More
PUM
Login to View More
Abstract
The invention relates to a construction method adopting guide positioning through a guide hole and smooth blasting. The construction method includes the steps that S1, a hole drilling blasting method is adopted for excavating a vertical shaft, an inclined shaft or a groove to the design elevation; S2, the four corners of the vertical shaft are excavated to form guide positioning holes, the drilled hole depth of the guide positioning holes reaches the design elevation; S3, the four positioning holes are connected, positioning control pre-cracking holes are distributed on a peripheral excavation line, and drilling to the design elevation is achieved at a time; S4, based on field engineering geology and rock conditions, the number of the drilled holes is appropriately increased, and the charging amount is adjusted; and S5, after vertical footage by 5 m, blasting excavation is paused, pouring of concrete is used for locking, after a tunnel is through, the vertical shaft is blast to penetrate a safety layer, and parallel slag discharging from the tunnel is achieved. The construction method has the beneficial effects that the construction quality is improved, the back break amount is reduced, and the stability of surrounding rock is good; the temporary support lining work amount can be reduced, and the construction cost is reduced; and the construction period can be accelerated.
Description
technical field [0001] The invention relates to a blasting construction method, in particular to a blasting construction method using pilot holes for guiding and positioning and smooth surface blasting. Background technique [0002] Drilling and blasting excavation technology is mainly used in blasting excavation projects of various vertical (inclined) wells, tunnels, rocks, etc. in transportation, water conservancy, industrial and civil construction, and civil defense. [0003] Due to the ever-changing engineering geological conditions and construction conditions, the selection of various parameters is based on the primary selection of parameters based on experience, and then determined through field tests. For example, blasthole diameter should consider blasthole utilization rate, drilling efficiency, rock stability and other factors. In the specific construction, there are often actual conditions such as uneven rock hardness, different degrees of weathering, and differen...
Claims
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine