Construction method adopting guide positioning through guide hole and smooth blasting

A technology of guided positioning and smooth blasting, applied in blasting and other directions, can solve the problems of easy bending of eye holes, excessive error between holes, affecting blasting effect, etc., to reduce engineering volume, low cost, reasonable construction method and The effect of craftsmanship

Active Publication Date: 2017-08-22
哈密新智源水利水电工程建设监理有限公司
View PDF4 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] From the perspective of economic benefits of blasting, the circular footage generally takes a large value, but as the eye depth increases, the drilling efficiency decreases, and the holes are prone to bending, and the error between holes is too large, which affects the blasting effect

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0016] The principles and features of the present invention are described below, and the examples given are only used to explain the present invention, and are not intended to limit the scope of the present invention.

[0017] Using pilot hole-oriented positioning and smooth blasting construction methods, in the excavation of bedrock and bank slope rocks, diversion and drainage tunnels, and spillway tunnels in the Anlagou Reservoir, Wulatai Reservoir, and Liushugou Reservoir Project in Hami City be widely used.

[0018] For the diversion tunnel shaft project of the Anlagou Reservoir Project in Hami City, the blasting height of the rockwork is 20.82m, the geometric size of the shaft is 7.2m*9.2m, and the depth is relatively large, and the rock geology is complex, so a feasible construction plan must be adopted. Using the traditional blasting construction technology, it is bound to fail to control the quality after blasting.

[0019] In order to ensure the size and plane positi...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a construction method adopting guide positioning through a guide hole and smooth blasting. The construction method includes the steps that S1, a hole drilling blasting method is adopted for excavating a vertical shaft, an inclined shaft or a groove to the design elevation; S2, the four corners of the vertical shaft are excavated to form guide positioning holes, the drilled hole depth of the guide positioning holes reaches the design elevation; S3, the four positioning holes are connected, positioning control pre-cracking holes are distributed on a peripheral excavation line, and drilling to the design elevation is achieved at a time; S4, based on field engineering geology and rock conditions, the number of the drilled holes is appropriately increased, and the charging amount is adjusted; and S5, after vertical footage by 5 m, blasting excavation is paused, pouring of concrete is used for locking, after a tunnel is through, the vertical shaft is blast to penetrate a safety layer, and parallel slag discharging from the tunnel is achieved. The construction method has the beneficial effects that the construction quality is improved, the back break amount is reduced, and the stability of surrounding rock is good; the temporary support lining work amount can be reduced, and the construction cost is reduced; and the construction period can be accelerated.

Description

technical field [0001] The invention relates to a blasting construction method, in particular to a blasting construction method using pilot holes for guiding and positioning and smooth surface blasting. Background technique [0002] Drilling and blasting excavation technology is mainly used in blasting excavation projects of various vertical (inclined) wells, tunnels, rocks, etc. in transportation, water conservancy, industrial and civil construction, and civil defense. [0003] Due to the ever-changing engineering geological conditions and construction conditions, the selection of various parameters is based on the primary selection of parameters based on experience, and then determined through field tests. For example, blasthole diameter should consider blasthole utilization rate, drilling efficiency, rock stability and other factors. In the specific construction, there are often actual conditions such as uneven rock hardness, different degrees of weathering, and differen...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): F42D3/04F42D1/00
CPCF42D1/00F42D3/04
Inventor 李军刘学明王新刚张会平王超周生祥王文杰
Owner 哈密新智源水利水电工程建设监理有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products