Large deformation control method of chlorite quartz schist stratum one-hole three-lane highway tunnel
A technology for road tunnels and control methods, applied in tunnels, tunnel linings, underground chambers, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] The present invention provides a large deformation control method for a single-hole three-lane road tunnel in chlorite schist stratum, based on the method of reserving core soil for three-step annular excavation, such as figure 1 As shown, the excavation and support of the tunnel are carried out under the advance support, in which the steel frames at the tunnel arch, side walls and inverts are all made of double-layer HK200b steel, and are supported in stages, of which the first layer When the steel frame is constructed, the corresponding reserved deformation is 90~120cm, and when the second layer of steel frame is constructed, the corresponding reserved deformation is 45~60cm. Each layer of the steel frame is equipped with double-layer Φ8 steel mesh. The grid spacing is 20×20cm, which specifically includes the following steps:
[0034] (1) Advance support: use double rows of 3.5m long Φ50 advance grouting small conduits 1 with a circumferential spacing of 40cm, and mak...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com