Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

A real-time active power control method for new energy power plants considering malicious applications and over-delivery penalties

A control method and new energy technology, applied in the direction of single-network parallel feeding arrangement, etc., can solve the problems of over-generation and under-generation active power control of power stations without new energy, so as to promote the consumption of new energy, reduce output deviation, and protect the market The effect of the transaction

Active Publication Date: 2021-12-17
STATE GRID HEILONGJIANG ELECTRIC POWER COMPANY +2
View PDF13 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Chinese invention patent "A method of power contract transaction under the coordinated control mode of Dutch network sources" (Application No.: CN201610952204.4) takes the contract consumption power generation plan curve issued by the dispatching center as the assessment baseline for the breach of contract, excess power generation and breach of contract The low power generation is assessed, but the breach of contract is only dealt with from the perspective of electricity bill settlement, and there is no direct control over the over-generation and under-generation of new energy power stations.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A real-time active power control method for new energy power plants considering malicious applications and over-delivery penalties
  • A real-time active power control method for new energy power plants considering malicious applications and over-delivery penalties
  • A real-time active power control method for new energy power plants considering malicious applications and over-delivery penalties

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0036] The present invention will be further described below. The following examples are only used to illustrate the technical solution of the present invention more clearly, but not to limit the protection scope of the present invention.

[0037]The present invention provides a new energy power station real-time active power control method considering malicious application and over-delivery punishment. New energy power stations that fail to meet the application target for additional output and keep it for a certain period of time will be punished for malicious application, and new energy power stations that exceed different limits in the assessment cycle will be punished for malicious over-generation, so as to realize the application of new energy power station power generation and additional output To reduce the output deviation of new energy power stations, ensure fair participation of new energy in market transactions, and promote the consumption of new energy.

[0038] s...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a real-time active power control method of a new energy power station considering malicious application and over-delivery punishment. Specifically, for the malicious application and over-delivery of the new energy power station, the new energy power station is added according to the corresponding assessment time. Application and over-delivery assessment, corresponding malicious over-delivery penalties will be imposed on new energy power plants whose excess power generation exceeds different limits at the assessment time, and malicious application penalties will be imposed on new energy power plants whose active power fails to meet the application target for additional output at the assessment time and maintains for a certain period of time , so as to realize the standardized guidance of new energy power station power generation and application for additional output, reduce the deviation of new energy power station power transactions, ensure fair participation of new energy in market transactions, and promote new energy consumption.

Description

technical field [0001] The invention relates to a real-time active power control method of a new energy power station considering malicious application and over-delivery punishment, and belongs to the technical field of power system operation and control. Background technique [0002] With the development of clean energy in my country, the installed capacity and consumption of new energy, mainly photovoltaic and wind power, are increasing year by year, and the access scope of power trading is also expanding, so that the proportion of new energy participating in market transactions is gradually increasing. However, based on the power generation plan issued by the dispatching agency, the volatility of new energy itself can easily lead to greater deviations in the real-time output of new energy power plants compared with traditional thermal power. How to make full use of new energy power generation, design a reasonable power trading model, reduce the deviation of new energy pow...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): H02J3/48
CPCH02J3/48
Inventor 陈堂龙王宁徐泰山郭丹阳汪马翔胡本然周天彭宇王昊昊孟祥星常康华科李吉晨王玚扈卫卫
Owner STATE GRID HEILONGJIANG ELECTRIC POWER COMPANY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products