Peak shaving and valley filling real-time control method for waste battery system
A waste battery, peak-shaving and valley-filling technology, applied in the direction of flexible AC power transmission system, AC network load balancing, etc., can solve the problem of waste battery damage and scrapping, and achieve the effect of reducing accidents, avoiding accidents, and improving charging power
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0020] Such as figure 1 As shown, the present invention provides a technical solution: a real-time control method for peak-shaving and valley-filling of a waste battery system, including the following steps: Step 1. Real-time acquisition of time data through the energy storage system to judge power consumption, and the electricity price curve refers to domestic standards , the first 6 hours and the last two or two hours of each day are low electricity price pe...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
