Double shield tbm tunneling construction method for hard rock formation

A construction method and double-shield technology, applied in earthwork drilling, data processing applications, instruments, etc., can solve the problems of limited guidance effect, difficult excavation construction, and many model parameters, so as to improve construction efficiency and construction safety, Guaranteed timeliness and accuracy, strong real-time effect

Active Publication Date: 2021-08-03
CHINA HYDROELECTRIC ENGINEERING CONSULTING GROUP CHENGDU RESEARCH HYDROELECTRIC INVESTIGATION DESIGN AND INSTITUTE
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] 1. It involves some parameters that are difficult to obtain directly, such as the elastic wave velocity of the surrounding rock, the specific work of rock chiseling, etc., and need to be tested separately. Therefore, the parameter acquisition is not instant, and it is difficult to guide the tunneling construction in time. It is mostly used for the data in the later stage of construction collection and analysis
[0006] 2. This method first needs to classify the surrounding rock, and the existing authoritative surrounding rock classification methods mainly include the BQ classification method based on the basic quality index BQ of the rock mass in the "Code for Design of Highway Tunnels" (JTG D70-2004), The hydropower surrounding rock engineering geological classification HC classification method, Q system classification method and RMR classification method in the "Code for Hydropower Engineering Geological Exploration" (GB50287-2016), although these classifications are rigorous and systematic, but these classification methods They only rely on the qualitative characteristics of the basic quality of the rock mass and the elastic wave velocity of the surrounding rock to classify, and have limited guidance on the design of construction parameters and support parameters for double-shield TBM tunneling in hard rock formations.
But Q TBM The model has many parameters, including a total of 21 input parameters. At the same time, some input parameters are irrelevant to TBM performance. Guidance on the Design of Construction Parameters and Support Parameters of Tunneling in Hard Rock Stratum

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Double shield tbm tunneling construction method for hard rock formation
  • Double shield tbm tunneling construction method for hard rock formation
  • Double shield tbm tunneling construction method for hard rock formation

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0031] The present invention will be further described below.

[0032] The double-shield TBM tunneling construction method for hard rock formations, including the steps to guide the tunneling construction according to the suitability classification of double-shield TBM surrounding rock excavation in hard rock formations;

[0033] The process of the suitability classification of the double-shield TBM surrounding rock excavation in the hard rock formation is as follows:

[0034] S1. Divide the rock strength of the double-shield TBM construction site according to Table 1, and determine the rock strength score a;

[0035] Table 1:

[0036]

[0037]

[0038] S2. Divide the rock integrity of the double-shield TBM construction site according to Table 2, and determine the rock integrity score b;

[0039] Table 2:

[0040]

[0041] S3, according to the formula c=a+2b, determine the basic rock quality score c of the double-shield TBM construction site, and complete the surro...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention belongs to the field of tunnel excavation, and specifically discloses a double-shield TBM excavation construction method for hard rock strata. The method can timely and effectively guide the excavation construction and support design of the double-shield TBM in the hard rock stratum. The double-shield TBM tunneling construction method for the hard rock formation includes grading the suitability of the double-shield TBM tunneling under the hard rock formation, so as to guide the steps of tunneling construction and subsequent support according to the classification. Since the judgment parameters used in the classification are easy to obtain and have strong immediacy, and because the rock wear resistance and penetration ratio parameters are all recorded during equipment excavation, they can truly reflect the objective situation of actual excavation and avoid The deviation between the theoretical test value and the actual operation is eliminated, so the timeliness and accuracy of the classification are effectively guaranteed. Based on this, the construction guidance and support design proposed can effectively guide the tunneling construction of the double-shield TBM in the hard rock formation in a timely and effective manner. And support, greatly improving the construction efficiency and construction safety.

Description

technical field [0001] The invention belongs to the field of tunnel excavation, and in particular relates to a double-shield TBM excavation construction method for hard rock formations. Background technique [0002] In tunnel construction, by grading the excavated rock mass, it is beneficial to design excavation parameters and support parameters for surrounding rocks with different conditions. Tunnel mechanical excavation often uses full-section tunnel boring machine for surrounding rock excavation. The English abbreviation of full-section tunnel boring machine is TBM; TBM is mainly divided into open TBM, single-shield TBM and double-shield TBM, of which double-shield TBM It has strong adaptability to geological conditions, and the peripheral of the whole machine is equipped with a cylindrical shield structure that is consistent with the diameter of the machine, which is conducive to excavating soft, broken or complex rock formations. When using double-shield TBM excavation...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21D9/087G06Q10/06
CPCE21D9/087G06Q10/06393
Inventor 钟果
Owner CHINA HYDROELECTRIC ENGINEERING CONSULTING GROUP CHENGDU RESEARCH HYDROELECTRIC INVESTIGATION DESIGN AND INSTITUTE
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products