Well and layer selection method of flowback measures after injecting large-dose oil displacement liquid into oil production well nearby sandstone oil reservoir fault
A technology for sandstone oil reservoirs and oil production wells, applied in the field of oilfield development, can solve problems such as lack of effective and reasonable well selection and layer selection methods, and achieve the effects of long construction time, fast filtration loss, and guaranteeing smooth completion.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0038] The present invention will be further described in conjunction with Xing13-Ding3-45 well of Xingshugang Oilfield in Daqing Oilfield.
[0039] (1) Optimizing the target well
[0040] Well Xing 13-Ding 3-45 is a primary production well in the transitional zone of Xing 13 District. figure 1 It is the well location map of Xing 13-Ding 3-45 well. The well is located at the edge of the fault, and it is connected to three wells for unilateral water injection. There is no water injection well connected to the production wells near the fault, and the development effect of the well group is poor. The well is 153m away from the fault, which is greater than the required safety distance of 80m. There are roads in the well site, and vehicles can be entered and placed. The cementing quality of the oil zone is excellent. The technical condition of the casing is good, no reinforcement, no casing damage, no channeling, and no debris in the well.
[0041] The average thickness of the...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


