Power system distribution robustness real-time scheduling method and system considering flexibility requirements
A real-time scheduling, power system technology, applied in electrical components, circuit devices, AC network circuits, etc., can solve the problems that do not consider specific scenarios, cannot meet the needs of power system flexibility, and do not have clear flexibility requirements and uncertainties. relationship and other issues, to achieve the effect of taking into account flexibility and economic indicators, and good consideration
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] like figure 1 As shown, a power system distributed robust real-time scheduling method considering flexibility requirements in this embodiment includes:
[0034] S101: Obtain the power system topology and related parameters, and obtain the flexibility requirements of the regulation capacity provided by each unit;
[0035] S102: On the basis of considering the adjustment capacity flexibility requirement and economy, convert the adjustment capacity flexibility requirement of the corresponding unit into an economic index, and form an objective function together with the unit fuel cost;
[0036] S103: Solve the objective function under the most unfavorable probability distribution condition that satisfies the constraint, so that the expected cost is the lowest, and the output increment of the generating unit is obtained, and then in the real-time dispatching, according to the linear automatic generation control strategy, the power imbalance is allocated to the power distribu...
Embodiment 2
[0138] This embodiment provides a power system distributed robust real-time dispatch system considering flexibility requirements, including:
[0139] A data acquisition module, which is used to acquire the power system topology and related parameters, and obtain the flexibility requirements of the adjustment capacity provided by each unit;
[0140] Objective function building block, which is used to convert the adjustment capacity flexibility demand of the corresponding unit into an economic index, and form the objective function together with the unit fuel cost;
[0141] The real-time scheduling module is used to solve the objective function under the most unfavorable probability distribution condition that satisfies the constraints, so that the expected cost is the lowest, and the output increment of the outgoing unit is obtained, and then in the real-time scheduling according to the linear automatic power generation control strategy, based on the power distribution factor. ...
Embodiment 3
[0145] This embodiment provides a computer-readable storage medium, on which a computer program is stored. When the program is executed by a processor, the power system distribution robust real-time scheduling method considering flexibility requirements as described in Embodiment 1 is implemented. step.
PUM