Evaluation decision system for campus legal risk early warning
A risk early warning and decision-making system technology, applied in the field of legal risk management and control in colleges and universities, can solve the problems of inability to design effective evaluation levels and evaluation standard rules for legal risks, and achieve the effects of improving accuracy, simple early warning process, and clear results
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] Embodiment 1 of the evaluation and decision-making system for campus legal risk early warning of the present invention is basically as attached figure 1 As shown, it includes: collection module, used to collect legal risk information; screening module, used to filter out representative key information; evaluation module, used to use AHP for early warning; early warning module, used Early warning measures are carried out in two aspects.
[0035] S1. The collection module collects legal risk information.
[0036] The acquisition module consists of a student consultation terminal, a student reward task terminal, a counselor consultation terminal, a campus offline public opinion investigator terminal, a campus online cooperation platform feedback terminal, and a data crawling terminal. Each student has an account to log in to the counseling terminal to feed back events to the platform to achieve collection. Each counselor also has an account to feed back the student's prob...
Embodiment 2
[0053] The only difference from Example 1 is:
[0054] Also included is a prevention module for automatically generating and pushing incident reports to involved objects after the incident is over. After the event is over, the event report is automatically generated, and information such as the number of victims, colleges, event cycle, handling methods, and damage degree is pushed to the involved objects, which is conducive to timely push of relevant information after the event is over, and at the same time periodically and regularly advance to the Students and counselors issue prevention and control warnings and related knowledge learning tasks.
[0055] The content of the early warning also includes: providing legal consulting assistance to designated objects, that is, providing legal consulting assistance to students involved in the third-level risk and their parents or risk-related objects designated by the school; file risk review, reviewing the legality and rationality o...
Embodiment 3
[0057] The only difference from Embodiment 1 is that when students’ questions are collected, the performance of students when they input questions is collected synchronously; after it is judged that an early warning is required, corrections are made according to the performance of students when they input questions, and whether an early warning is required is reconfirmed.
[0058] Specifically, in this embodiment, students use voice to input legal issues that need to be consulted. When students use voice to input, the microphone performs real-time recording, and then analyzes and marks the voice signal in the recording. In addition, the camera captures video of students typing legal questions for consultation, and then analyzes the students' facial expressions. Finally, based on the student's voice signal and facial expression, it is judged whether the information entered by the student is sufficient, whether there is any concealment, and whether there is the possibility of lyi...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com