Rainy season roadbed earthwork construction structure and construction method thereof
A technology for earthwork and construction methods, applied in chemical instruments and methods, roads, roads, etc., can solve problems affecting construction progress, roadbed deviation, long construction period, etc., to reduce the possibility of water accumulation and ensure the effect of drainage
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0039] The following is attached Figure 1-4 The application is described in further detail.
[0040] The embodiment of the present application discloses a roadbed earthwork construction structure in a rainy season.
[0041] refer to figure 1 , a subgrade earthwork construction structure in rainy season, including a drainage assembly 2 arranged in a settlement well 1, the drainage assembly 2 includes a drainage pipe 21 and a hollow filter box 22, and the filter box 22 is vertically and fixedly arranged in the settlement well 1.
[0042] refer to figure 1 , The wellhead of the settlement well 1 is provided with an overflow port 11 . If there is too much rainwater, it will be discharged from the overflow port 11, reducing the flood discharge pressure of the municipal pipeline.
[0043] Among them, such as figure 2 As shown, the side wall of the filter box 22 is provided with several filter holes 221 . The cross-section of the filter box 22 is set to be circular, wherein, ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com