The utility model relates to the technical field of
road construction, in particular to a road
subgrade lower spring opening treatment structure. According to the spring opening treatment structure, upper and lower
layers of longitudinal
water seepage blind pipes are arranged on blind
ditch sections corresponding to spring openings, spring opening water is collected by the
water seepage blind pipes and then converged into a collecting
pipe, and then the water is drained out of a road roadbed through the collecting
pipe and finally drained into a roadside drainage
system; composite geomembranes are arranged at the bottom of an excavation area of a blind
ditch section and on the roadbed side close to a road and used for blocking contact between roadside spring opening water and a soil layer on the lower portion of a roadbed, and spring opening
water seepage is prevented from damaging a roadbed soil body and affecting the roadbed strength; the
pebble layer is backfilled on the waterproof layer, the permeable
geotextile is arranged to form the permeable layer, it is guaranteed that seepage water can be smoothly collected and discharged, meanwhile, the
pebble layer has the effects of sealing and pressing spring holes and improving strength, and finally the purposes of water drainage and pressure relief are achieved.