224results about How to "Accelerated consolidation" patented technology

Method for treating spiral oil-extruding filling pile composite foundation in stratum containing soft clay

The invention relates to a construction method of a spiral oil-extruding filling pile composite foundation in the stratum containing soft clay, which comprises the following steps: determining the structural size, the position and the number of spiral oil-extruding filling piles; manufacturing and constructing a vertical drainage well in the middle part of the design positions of every two adjacent spiral oil-extruding filling piles; manufacturing and constructing each spiral oil-extruding filling pile according to the design position in the middle part between every two finished vertical drainage wells; and then paving drain liner layers on the foundation surface. The invention aims at providing a method for treating the spiral oil-extruding filling pile composite foundation in the stratum containing the soft clay, which avoids the negative oil-extruding effect of the spiral oil-extruding filling piles, improves the drain speed of saturated clay around piles, improves the strength of soil bodies around the piles and under the piles, substantially reduces the settlement after construction, improves the effectiveness and the use range of the spiral oil-extruding filling piles, increases the space length between the piles, reduces the pile number, saves the engineering investment, and accelerates the construction progress.
Owner:CENT RES INST OF BUILDING & CONSTR CO LTD MCC GRP +1

Multiple pressurizing fast consolidated compacting soft earth foundation treatment method

InactiveCN101016740AIncreased excess pore water pressureExpand the scope of processingSoil preservationSoil sciencePresent method
The invention in a technical sphere of soft soil ground treatment in geotechnical engineering relates to a soil ground treatment method in the areas along the sea, the river and the lake. The invention combines a vacuum drainage, a compaction via vibration supercharging, and a compaction via dynamic consolidation supercharging, wherein a higher kinetic head gradient which is consisted of a positive pressure of excess pore water by vibration excitation and a vacuum negative pressure firstly discharges the water in soil and increases the water content in the soil, thereby compacting the soil to a certain extend, and then the dynamic consolidation action is proceeded to improve the excess pore water pressure and form the higher kinetic head gradient thereby draining and compacting the soil. All the steps are proceeded many times to eliminate the settling of the worked deep layer soft soil and to improve surface consolidation degree, intensity, and stiffness until up the design requirement. Compared with the present method, the invention not only has a short time for a project, lower manufacturing cost and settling after work, and a good effect of consolidating and compacting, but also is extensive used in the soft soil ground treatment of various projects in the area along the sea, the river, or the like.
Owner:武亚军

Mine goaf tailing-filled concrete enclosing wall

The invention discloses a mine goaf tailing-filled concrete enclosing wall. The wall body (2) of the mine goaf concrete enclosing wall is a horizontally placed rock-socketed pear-shaped concrete structure. The large end of the wall body (2) faces to a mine goaf (10). The convex drum-shaped upper part of the large end of the wall body (2) runs through a small rock mass well (1). An upper drain pipe (4) and a lower drain pipe (4) are arranged in the wall body (2) and are respectively used as an upper part drain pipe and a lower part drain pipe. The inlet of the upper part drain pipe and the inlet of the lower part drain pipe are respectively provided with a perforated pipe (7). The outlet of the upper part drain pipe and the outlet of the lower part drain pipe are respectively provided with a gate valve (5). A layer of stainless steel wire mesh covers the external surface of the perforated pipe (7) at the inlet of the lower part drain pipe. A sandstone inverted filter body (6) with certain thickness is spread outside the stainless steel wire mesh. A layer of geotextiles covers the surface of the sandstone inverted filter body (6). The invention has the advantages that the wall can bear the pressure of water head above 300m, the water and sand leakage can be prevented, the tailing settlement water can be drained, the tailing pore water can be also drained, and the consolidation degree and the stability of the tailing-filled body in the mine goaf can be improved.
Owner:TONGLING NONFERROUS METALS +1

Double-layer low-position vacuum preload consolidation device and soft soil foundation reinforcing method

InactiveCN101413261AImprove bearing capacitySolve the difficult problem of occupying landSoil preservationSludgeEngineering
The invention provides a double-layer low level vacuum preloading consolidation device and a soft soil foundation consolidation method. The device consists of a main controller, a power distribution controller, a vacuum pump, a submersible pump, a buffer knockout drum, a control valve, a vacuum gauge, a vacuum degree detecting head, a hydraulic fill consolidation layer vacuum pipe network, a soft soil consolidation layer vacuum pipe network, a subsidence mark, an open water overflow port, pipes and gauge tables, wherein a cofferdam is reclaimed along the consolidation area border in the soft soil foundation, a soft soil consolidation layer is formed in the cofferdam, the soft soil consolidation layer is provided with the soft soil consolidation layer vacuum pipe network and a hydraulic fill consolidation layer, the hydraulic fill consolidation layer is provided with a bearing separation layer and the hydraulic fill consolidation layer vacuum pipe network, and the hydraulic fill consolidation layer vacuum pipe network is hydraulically filled with a sealing layer. The invention has the advantages of reasonable structure, convenient construction, short construction period, low cost, good consolidation effect, facilitation of construction in large areas, consolidation of the soft soil foundation, dredging, and reutilization of the dredged sludge after consolidation, and can solve the problem of difficult land occupation of a blow-off field and create economic benefits.
Owner:TIANJIN WATER RESOURCES RES INST

High-efficiency curing method for soft soil site with high moisture content

ActiveCN109763480AEfficient reinforcementReduce inputSoil preservationSoil scienceCement slurry
The invention belongs to the technical field of environment rock-soil engineering and discloses a high-efficiency curing method for a soft soil site with high moisture content. The high-efficiency curing method comprises an in situ chemical curing step and a preloading drainage step; the in situ chemical curing step comprises investigating sites, determining physical and chemical indexes such as depth, area, moisture content, organic matter content, liquid plastic limit and salt content of the soft soil site; blending a curing agent, determining the types, adding ratio, and initial and final setting time of the curing agent based on the physical and chemical indexes; blocking the site, and building partition walls for site blocking in the soft soil site; carrying out chemical curing construction, and uniformly mixing the blended curing agent with to-be-cured soft soil; carrying out preloading drainage construction according to three construction modes of vacuum preloading or surchargepreloading or vacuum surcharge preloading; unloading and repairing the site; after preloading time reaches 28 days, swabbing off drained water from the upper surface layer of curing blocks, unloadingand injecting cement slurry into a drain board for secondary repair and reinforcement by adopting a high-pressure grouting pump.
Owner:INST OF ROCK & SOIL MECHANICS CHINESE ACAD OF SCI

Construction method of deep and thick soft soil foundation bed bridge abutment

The invention discloses a construction method of a deep and thick soft soil foundation bed bridge abutment. The method comprises steps as follows: 1) forming a bridge abutment land construction area; 2) performing primary soft foundation treatment-vacuum water covering and pre-pressing treatment on the bridge abutment land construction area; 3) performing bridge abutment pile foundation construction and bearing platform construction; 4) performing secondary soft foundation treatment-composite foundation treatment on the bridge abutment land construction area; 5) backfilling the area behind the bridge abutment with a filler; and 6) completing the construction of a bridge abutment concrete structure. According to the construction method, due to the secondary soft foundation treatment, post-construction settlement of a road behind the bridge abutment and settlement differences between the road and a bridge abutment structure are reduced, and the phenomenon that a vehicle bumps at a bridge head can be prevented. The construction method of the deep and thick soft soil foundation bed bridge abutment is simple, convenient and feasible, high in efficiency, safe and reliable, and can control the project quality conveniently and save labor power, material resources and financial resources. The construction method is applicable to an area with a low foundation bearing capacity.
Owner:TIANJIN 20 CONSTR

Wet and soft soil foundation treatment method

The invention discloses a wet and soft soil foundation treatment method which comprises the steps of 1, backfilling completely within the roadbed width range; 2, before roadbed construction, firstly, removing surface water, and then removing the surface layer salinized soil and surface organic matter of a construction region; 3, backfilling gravel soil within the treatment range, and carrying out primary rolling; after rolling is finished, leveling to form a cross slope; 4, excavating two trapezoid drainage ditches respectively at the two sides of a roadbed; 5, laying a plastic drainage plate; 6, dynamic compaction, compacting by points for twice and fully compacting for once; 7, after dynamic compaction treatment, rearranging the roadbed, and cleaning the overground part of the top of the drainage plate; laying a middle coarse sand cushion layer as a drainage channel, wherein the gradient of the middle coarse sand cushion layer is equal to that of the roadbed; placing a bending part of the plastic drainage plate in the center of the sand cushion layer to enable the bending part to be communicated with the sand cushion layer; 8, backfilling gravel soil onto the middle coarse sand cushion layer; 9, after the roadbed is finished, laying gravel on the surface layer, rolling and compacting.
Owner:JINAN MUNICIPAL ENG DESIGN & RES INSITITUTE GRP

Structure and method for dissipating excess pore water pressure and reinforcing shield tunnel soil body

InactiveCN103422868AIncrease soil effective stressAccelerate soil consolidationUnderground chambersTunnel liningStructural engineeringStructure of the Earth
The invention discloses a structure for dissipating excess pore water pressure and reinforcing a soil body around a shield tunnel. The structure comprises pipe pieces, first type grouting holes, second type grouting holes and infiltration bars, wherein the first type grouting holes and the second type grouting holes are formed in the pipe pieces, the infiltration bars are arranged to be hollow, and holes are drilled all over the bodies of the infiltration bars. The infiltration bars are integrally arranged inside the pipe pieces in a buried mode through the first type grouting holes, the tail ends of the infiltration bars are connected with the first type grouting holes, the first type grouting holes with the infiltration bars are distributed with the second type grouting holes as centers, four first type grouting holes with the infiltration bars are distributed in the adjacent periphery of each second type grouting hole, and four second type grouting holes used for grouting are distributed in the adjacent periphery of each first type grouting hole provided with the infiltration bar. According to the structure, the infiltration bars are inserted into the grouting holes of the pipe pieces and the infiltration bars are used for extracting water in surrounding soil, so that an infiltrating path is provided for the water contained in the soil body around the tunnel, excess pore water pressure is dissipated, effective stress of the soil is increased and soil solidification is accelerated.
Owner:TONGJI UNIV

Foundation heating device and construction method for foundation heating combined vacuum prepressing of soft soil foundation by applying such device

The invention discloses a foundation heating device and a construction method for foundation heating combined vacuum prepressing of a soft soil foundation by applying such device. Vertical plastic draining plates are arranged in a foundation, plate heads of the vertical plastic draining plates are connected to transversely arranged filter pipes, outlet ends of all filter pipes are communicated with an inlet of a pressure guiding flow separating device, heating devices are further arranged in the foundation, a sand cushion layer is paved on the foundation, the filter pipes are buried in the sand cushion layer, a thermal insulation layer is paved on the sand cushion layer, and a sealing film is paved on the thermal insulation layer to form a closed vacuum prepressing system. During work, the pressure guiding flow separating device is firstly opened to perform foundation reinforcing treatment by a general vacuum prepressing method; when general drainage consolidation is performed to the later stage, a temperature control heating body is opened to perform foundation heating, meanwhile the foundation is vacuumized, and by controlling a foundation heating temperature and a foundation absolute pressure, water content in the foundation is converted to a gas state from a liquid state, and therefore, the water content of the foundation is further reduced, and the strength of the foundation is increased.
Owner:TIANJIN UNIV

'Short-distance overload vacuum precompression and dynamic water-drainage consolidation united method' soft foundation processing method

A ''short-range overloading vacuum prepressing---dynamic discharging consolidation combination method'' to dealing with the soft soil ground foundation, its features are : overloading prepressing the vacuum membranes of conventional vacuum prepressing method with covering water; proceeding the settlement observation to each settlement observation points according the vacuum prepressing operating rules, continuing prepressing 5~10 days after the prepressing settlement above 80% of calculate settlement, then stopping the water overloading vacuum prepressing after ensuring stable completely; removing the vacuum membrane and sun-curing 1~2 days, then proceeding the dynamic dewatering consolidation to eliminating the stored water in sand cushions which is leaved when overloading vacuum prepressing rapidly, then dynamic consolidation or roller compaction after the water level below 1.5m. Its beneficial effects are: it can eliminate the water in muck soil during a short time and enhance the consolidation degree; it makes the skin soil layer get the greatest density, meets the requirements of load bearing capacity and rigidity rapidly and prevents rebound phenomenon; it shortens the construction period and lowers the costs and applies to large area project filling soil recently which has large thickness saturated soft soil particularly.
Owner:CCCC ROAD & BRIDGE SPECIAL ENG

Method for determining soft soil foundation landfill site foundation treatment mode based on foundation bearing capacity

The invention discloses a method for determining soft soil foundation landfill site foundation treatment mode based on foundation bearing capacity. Firstly correction of foundation bearing capacity is carried out according to geological exploration report, then whether the corrected foundation bearing capacity meets landfill site total load requirement is judged, and whether treatment is required is determined according to the judging result, if treatment is required, the selected treatment mode includes foundation treatment by adopting reinforcement cushion rubber (1) or foundation treatment by adopting reinforcement cushion rubber and setting vertical shaft (2). The invention utilizes the load characteristics of large occupying area of landfill site, long load application period and step application, landfill process of landfill site is taken as step loading process, the improvement of foundation bearing capacity in operation period of landfill site is analyzed according to piling, loading and prepressing method, the landfill speed and foundation bearing capacity correspond over time by controlling operation procedure, and meanwhile reinforcement cushion rubber is arranged to provide a drainage layer for soft soil foundation, thus not only improving foundation bearing capacity but also being capable of effectively reducing differential settlement of small repository.
Owner:TIANJIN MUNICIPAL ENG DESIGN & RES INST

Long-short plastic drainage plates-combined secondary vacuum preloading foundation processing method

The invention provides a long-short plastic drainage plates-combined secondary vacuum preloading foundation processing method, which comprises the following main steps of: laying geotextile or woven cloth on the surface of a foundation to be processed; arranging shallow longitudinal short plastic drainage plates in a striking manner; arranging a transverse drainage system for the short plastic drainage plates; laying a vacuum sealing membrane; removing water and gas in the transverse drainage body for the short plastic drainage plates by using a vacuum pump; stripping away the vacuum sealing membrane; arranging deep longitudinal long plastic drainage plates in a striking manner; arranging a transverse drainage system for the long plastic drainage plates; laying a vacuum sealing membrane; and synchronously removing the water and gas in the transverse drainage systems for the long and the short plastic drainage plates by using the vacuum pump. By using the technology, an early-stage shallow preloading system and later-stage deep processing are organically combined, the time for solidification of foundation soil is shortened, the effect of reinforcing is enhanced, and a fast and efficient construction process is realized.
Owner:河北晟港工程勘察设计有限公司

Negative skin friction (NSF) removing foundation treatment method

InactiveCN103741670AGuaranteed settlement deformationWarranty requirementsSoil preservationCrushed stoneBearing capacity
The invention discloses a negative skin friction (NSF) removing foundation treatment method. A method for combining discrete piles and flexible piles is used for treating NSF caused by self-weight consolidation of a soil body, gravel piles or sand-gravel piles can serve as the discrete piles, the discrete piles and the flexible piles are arranged at intervals, and gravelly soil cushions are laid on the foundation surface above the discrete piles and the flexible piles. According to the NSF removing foundation treatment method, self consolidation settlement of foundation soil is reduced by construction compaction and vibro-compaction of the discrete piles, loads can be transmitted to foundation supporting layers by the construction of the flexible piles so that stress and compressive deformation of a reinforced zone can be reduced, and 'extrusion' and 'clamping' effects can be achieved on soil among piles under the combined action of the discrete piles and the flexible piles so that consolidation settlement of the foundation soil and NSF caused by the consolidation settlement of the foundation soil can be inhibited. Meanwhile, the combined foundation treatment method can improve bearing capacity of a foundation to a large extent by drainage consolidation and substitution of the flexible piles.
Owner:SOUTHEAST UNIV

Three-layer knitted composite fabric and production technology thereof

The invention belongs to the technical field of clothing materials, particularly relates to three-layer knitted composite fabric and a production technology thereof, and solves the technical problems of poor wearing comfort, poor shape maintenance performance, small application range and the like in the prior art. The three-layer knitted composite fabric comprises wrap-weft insertion warp knitted fabric, outer fabric and inner fabric, wherein a first double-dot coating is arranged on one surface of the wrap-weft insertion warp knitted fabric; the outer fabric is connected with one surface of the wrap-weft insertion warp knitted fabric through the first double-dot coating; a second double-dot coating is arranged on one surface of the inner fabric, and the other surface of the wrap-weft insertion warp knitted fabric is connected with the inner fabric through the second double-dot coating. The production technology of the three-layer knitted composite fabric comprises steps as follows: A, preparation of materials; B, compositing. The three-layer knitted composite fabric and the production technology thereof have the advantages that the technology is simple, good balance between the wearing comfort and the shape maintenance performance can be kept, and the application range can be enlarged.
Owner:CPL NEW MATERIAL TECH CO LTD

Bamboo joint type sleeve pile and electroosmosis combined soft soil roadbed reinforcement system and construction method

The invention relates to a bamboo joint type sleeve pile and electroosmosis combined soft soil roadbed reinforcement system. The system is characterized by comprising an electroconductive plastic drainage plate, bamboo joint type sleeves, a prefabricated pile point and a prefabricated cover plate; the strip electroconductive plastic drainage plate tightly fits the outer sides of the bamboo joint type sleeves; the bamboo joint type sleeves are fixed through steel rings at certain intervals; the prefabricated pile point is arranged at the bottom end of a bamboo joint type sleeve pile; a U-shaped reinforcing bar is pre-buried in the prefabricated pile point; the bottom end of the electroconductive plastic drainage plate is connected with the U-shaped reinforcing bar; the prefabricated cover plate is arranged at the top end of the bamboo joint type sleeve pile; a preformed hole for allowing the electroconductive plastic drainage plate to pass through is reserved in the prefabricated cover plate; the electroconductive plastic drainage plate stretches out of the preformed hole; and the electroconductive plastic drainage plate is connected with a direct current power source through a conducting wire. The bamboo joint type sleeve pile and electroosmosis combined soft soil roadbed reinforcement system has the beneficial effects that the bamboo joint type sleeve pile is formed through connecting sections of bamboo joint type sleeves, and the problem that the construction is difficult due to the fact that the sleeve length of a conventional plastic sleeve pile is difficult to control is solved; and the bamboo joint type sleeves have bulges, so that the friction force of a common plastic sleeve pile and a surrounding soil body is improved, and the bearing capacity is improved.
Owner:ZHEJIANG UNIV CITY COLLEGE
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products