Building settlement observation point protection mechanism
A technology of building settlement and protection mechanism, which is applied in the directions of measuring point marking, measuring device, surveying and navigation, etc. It can solve the problems of easy loosening, destroying or covering the settlement observation point, and the sinking of the settlement observation point, so as to prolong the service life Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
no. 1 example
[0047] Such as Figure 1-2 , in the first embodiment of the present invention, the building settlement observation point protection mechanism comprises: body of wall 1; There are multiple fixed corners. By opening holes in the wall 1, fix the rectangular protection box 2 on the wall 1 through the fixed corners with expansion bolts, and then use a sealant gun to fill the rectangular protection box 2 with the wall. 1, so that the rectangular protection box 2 has a waterproof effect. During the decorative construction of the wall or column, the rectangular protection box 2 can be temporarily removed and reinstalled after the decoration is completed, so as to ensure that the rectangular protection box 2 continues to protect the settlement observation point 3 inside it. The settlement observation point 3 is arranged in the rectangular protection box 2; the switch door 4, the switch door 4 is arranged on one side of the rectangular protection box 2; the first rectangular block 5, t...
no. 2 example
[0055] Based on the building settlement observation point protection mechanism provided in the first embodiment of the present application, the second embodiment of the application proposes another kind of building settlement observation point protection mechanism, and the second embodiment is only an example of the first embodiment. In a further solution of the invention, the implementation of the second embodiment will not affect the single implementation of the first embodiment.
[0056] The second embodiment of the present invention will be further described below in conjunction with the drawings and implementation methods
[0057] Such as Figure 3-5 , in the second embodiment of the present invention, the building settlement observation point protection mechanism also includes: a rectangular fixed plate 17, the rectangular fixed plate 17 is fixedly installed on the top inner wall of the rectangular protection box 2, and the bottom of the rectangular fixed plate 17 is pro...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com