The invention particularly discloses a construction method for water receiving and drainage of an
expansion joint, which comprises the following steps of: 1, determining the positions of embedded bolt holes on two sides of the
expansion joint, and manufacturing the embedded bolt holes; secondly, positioning and paying off are conducted, and binding,
welding and fixing are conducted in the structural
beam column construction reinforcing
steel bar binding process; thirdly, a structural
beam column concrete formwork is erected, and concrete is poured; fourthly, after the structural formwork is disassembled, a water receiving groove is machined on site,
punching is conducted, and bolt fixing points are reserved; 5, adjusting and aligning the bolts, carrying the processed water receiving tank to a mounting position, aligning the water receiving tank to an embedded bolt hole after the water receiving tank is in place, adjusting the gradient of the water receiving tank, putting the bolts in place, and fixing the bolts; and 6, a water guide
pipe is installed at a reserved drainage hole of the water receiving tank and communicates with the drainage vertical
pipe, and sealing treatment is conducted on the periphery of the drainage hole. Leakage water at the
expansion joint is effectively guided, and the problem that waterproof construction of the expansion joint between a structural beam and a structural column is inconvenient can be solved.