An overall jacking device for an ancient building and its application method
An integral jacking and building technology, applied in building construction, construction, building maintenance and other directions, can solve problems such as low repair efficiency, achieve high construction efficiency, reduce maintenance costs, and improve maintenance efficiency.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0048] The implementation principle of a kind of ancient building integral jacking device in Embodiment 1 of the present application is:
[0049] After completing the adjustment of the horizontal position of the first fixed rod 42 and the height of the second fixed rod 43, the reconstruction of the roof is completed under the support of the second fixed rod 43, and then the hydraulic cylinder 31 is activated to connect the four support rods 22 and the four bases. The stage 21 and the mounting bracket 4 are lifted to the stroke limit of the hydraulic cylinder 31 and stopped. The worker inserts the lower ends of the four new support rods 22 into the insertion holes 111, so that the connecting rods 222 of the new support rods 22 and the After the connecting hole 221 of the upper support rod 22 is coaxially aligned, and the lift rod 32 and the piston rod of the hydraulic cylinder 31 are staggered, the piston rod of the hydraulic cylinder 31 is recovered, and the connecting hole 221...
PUM

Abstract
Description
Claims
Application Information

- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com