Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Construction site personnel management system

A technology for construction personnel and construction sites, applied in the field of construction site personnel management systems, can solve problems such as immeasurable economic losses, unreachable safety ropes, fatal or disabled problems, etc.

Pending Publication Date: 2021-09-28
HEBEI POWER TRANSMISSION & TRANSFORMATION +2
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] 1. Due to the complexity of the personnel on the construction site and the different types of work, the entrance of the construction site is often controlled by security guards. The manual inspection and control is not in place, which will cause unknown dangers. Especially during the epidemic, the body temperature of the personnel entering the construction site It is very necessary to detect the track and action track, because once the construction personnel who have been to the unsafe area enter the construction site by mistake, the construction progress will be affected, and the economic loss caused is immeasurable;
[0004] 2. Due to the large number of construction personnel, it is impossible for the management personnel to know each construction personnel very well, especially the ignorance of the types of work and working years, which leads to inaccurate job assignments, either causing a waste of personnel resources or wrong use of personnel , slowing down the work progress;
[0005] 3. It is not possible to monitor whether the construction personnel are working in the designated work area, and it is impossible to monitor the construction personnel who leave their posts without authorization. The work cannot continue because the construction personnel are not on duty, resulting in slow progress of the project;
[0006] 4. The performance appraisal of existing construction personnel is often recorded in the form of management personnel recording attendance, but the quality of construction personnel's work cannot be distinguished;
[0007] 5. Construction workers sometimes have dangerous operations on the construction site, such as climbing operations. Usually, they are tied with a safety rope, but if they accidentally fall down, the safety rope will not be very well protected and will cause personal injury. Certain personal injuries can be very fatal or disabling and, if at risk, can be tragic for the builder and the builder's family

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction site personnel management system
  • Construction site personnel management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0033] Such as figure 1 As shown, a construction site personnel management system includes a construction personnel identification module, a body temperature detection module, and an action track detection module set at the entrance of the construction site, and also includes a positioning module for locating construction personnel, and a system for recording the working hours of construction personnel. The performance assessment module, the video monitoring module for monitoring the working environment of the construction personnel, and the safety self-rescue module for the safety management of the construction personnel, the construction personnel identification module, body temperature detection module, positioning module, body temperature detection module, action trajectory detection module, The performance module, the video monitoring module and the safety self-rescue module are all connected to the background server through the wireless data terminal.

[0034] The furthe...

Embodiment 2

[0042] As shown in Figure 1: A construction site personnel management system includes a construction personnel identification module, a body temperature detection module, and an action track detection module set at the entrance of the construction site, as well as a positioning module for locating construction personnel and recording construction personnel. The performance appraisal module for working hours, the video monitoring module for monitoring the working environment of construction personnel, and the safety self-rescue module for safety management of construction personnel, the construction personnel identification module, body temperature detection module, positioning module, body temperature detection module, and action track The detection module, performance module, video surveillance module and safety self-rescue module are all connected to the background server through the wireless data terminal.

[0043] The further improvement of the technical solution of the pre...

Embodiment 3

[0046] Figure 1 to figure 2 Shown: A construction site personnel management system, including a construction personnel identification module, a body temperature detection module, and an action track detection module set at the entrance of the construction site, as well as a positioning module for locating construction personnel and a system for recording the working hours of construction personnel The performance assessment module, the video monitoring module for monitoring the working environment of the construction personnel, and the safety self-rescue module for the safety management of the construction personnel, the construction personnel identification module, body temperature detection module, positioning module, body temperature detection module, action trajectory detection module, The performance module, the video monitoring module and the safety self-rescue module are all connected to the background server through the wireless data terminal.

[0047] The further imp...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction site personnel management system, which is characterized by comprising a construction personnel recognition module, a body temperature detection module and an action track detection module which are arranged at the entrance of a construction site, the system further comprises a positioning module used for positioning constructors; a performance evaluation module used for recording the working time of the constructors; a video monitoring module used for monitoring the working environment of the constructors; and a safety self-rescue module used for performing safety management on the constructors; the construction personnel recognition module, the body temperature detection module, the positioning module, the body temperature detection module, the action track detection module, the performance module, the video monitoring module and the safety self-rescue module are all connected with the background server through a wireless data end.The invention is convenient for managers to supervise and manage construction personnel, and ensures project quality. The project progress is accelerated.

Description

technical field [0001] The invention relates to a construction site management system, in particular to a construction site personnel management system. Background technique [0002] Most of the existing construction site personnel are managers for manual management, and intelligent management is rarely used, and there will be the following technical problems: [0003] 1. Due to the complexity of the personnel on the construction site and the different types of work, the entrance of the construction site is often controlled by security guards. The manual inspection and control is not in place, which will cause unknown dangers. Especially during the epidemic, the body temperature of the personnel entering the construction site It is very necessary to detect the track and action track, because once the construction personnel who have been to the unsafe area enter the construction site by mistake, the construction progress will be affected, and the economic loss caused is immea...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/06G06K17/00G08B3/10
CPCG06Q10/06393G06Q10/06398G06Q10/06395G06Q10/063114G06K17/0022G08B3/10
Inventor 孙涛王怀民赵晔周雪涛
Owner HEBEI POWER TRANSMISSION & TRANSFORMATION
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products