Project management method based on Monte Carlo

A project management and project technology, applied in the direction of data processing applications, instruments, resources, etc., can solve the problems of single goal, inability to control the technical problems of the project process as a whole, and achieve a high pattern vision, fast and correct project management work, and guarantee Achieved effect

Pending Publication Date: 2022-03-01
SUZHOU IND PARK SURVEYING MAPPING & GEOINFORMATION CO LTD
View PDF2 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0007] In order to solve the technical problem that the existing project management method achieves a relatively single goa...

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Project management method based on Monte Carlo
  • Project management method based on Monte Carlo
  • Project management method based on Monte Carlo

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0049] Such as Figure 1-Figure 3 The present invention shown is a project management relationship diagram that takes into account the realization of customer goals, enterprise business goals and project goals; figure 2 Shown is the project management flow chart of the Monte Carlo-based project management method of the present invention, the whole process in the figure is nested with 2 processes; the outer ring process is an organization-level process, including the target decomposition and model definition of the enterprise organization level , model update, etc.; the inner loop process is the internal loop process of the project: Monte Carlo method simulation, planning, project implementation process data measurement, deviation rate update, Monte Carlo method simulation, plan update and project implementation process data measurement, etc. The inner-loop process first needs to introduce specific project goals and determine the ultimate project goal, and the inner-loop proce...

Embodiment 2

[0089] Such as Figure 1 to Figure 3 As shown, according to customer requirements, combined with the organization's business objectives and process performance baseline, determine the objectives of the project.

[0090] 1. For example, the company's strategic goal in 2021: expand new customers and new markets; basically complete the technology and customer accumulation in the market. 2) Establish a professional software product R&D management process based on the company's actual situation, improve product quality and R&D efficiency, control project costs, increase project gross profit by 5%, and achieve sales of 300 million.

[0091]2. Decompose the business goals of the organization. The key to realizing the business goals in 2021 lies in the timely acceptance of projects in various industries. This indicator will directly affect customer satisfaction, payment collection, output value and profit. Therefore, it is proposed that the control objectives and decomposition in the...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a project management method based on Monte Carlo, and relates to the technical field of project management, and the method comprises the steps: decomposing a commercial target; establishing a target and quantization process selection prediction model; performing rule definition on the target priority; adopting Monte Carlo simulation software to collect and count the probability value of each model simulation combination; selecting the most appropriate project process combination for achieving the project target, and determining an optimal project process scheme; decomposing the total target into each stage target; making a project plan; monitoring is carried out in the project management process, data measurement and deviation rate calculation are carried out, a Monte Carlo software simulation model is updated, the ordering process is optimized, and a plan is updated; and summarizing the project, importing the organization-level data measurement library, and updating the company baseline model. According to the method, the strategic goal of the company is emphasized, the realization of the business goal of the enterprise is highlighted, and the project management method from macroscopic to microscopic is beneficial to the long-term development of the company.

Description

technical field [0001] The invention relates to the technical field of project management, in particular to a Monte Carlo-based project management method. Background technique [0002] The core three elements of project management are time, cost and quality. In the software project delivery process, three goals need to be achieved: project schedule goal (completed within the specified time), project profit goal (cost control), project Quality goals (software defect rate and customer satisfaction). In the whole process of project management, the three elements maintain an equilateral triangle. As the project progresses, the included angle of this triangle will definitely be deformed, because the change of each element will affect the other two elements, resulting in the change of the included angle, thus It will affect the overall achievement of project goals. At the same time, we must also take into account the realization of customer goals, company business goals, and pro...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/06G06Q10/10
CPCG06Q10/063G06Q10/103
Inventor 谌文秀
Owner SUZHOU IND PARK SURVEYING MAPPING & GEOINFORMATION CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products