Temporary drainage construction process for large-pipe-diameter river channel crossing pool body construction
A construction technique and large-diameter technology, applied in water conservancy projects, road bottom, water conservancy engineering equipment, etc., can solve the problems of submersible sewage pump discharge that cannot meet actual needs, box culvert pipe leakage, etc., saving manpower and financial resources, and shortening the construction period. , the effect of low project cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0040]The core technical problem to be solved by the present invention is that the construction period of urban water treatment complex projects is generally long, spanning the urban rainy season and flood season. In the construction of this type of project in the prior art, the method of intercepting and pumping the drainage system is adopted. During the construction process of the project, the water flow is too large during the rainy season and flood season, and the means of pumping and drainage cannot meet the drainage demand, and secondary drainage is required. . Especially in the event of heavy rain, it is very likely to cause urban waterlogging and endanger the lives and property of the public. Therefore, the temporary drainage construction of the large-diameter river crossing the pool is carried out in the dry season, that is, the temporary drainage project is completed during the dry season. , can largely meet the drainage demand, and will not affect or harm the publi...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 