Method of operation support system performance testing of mobile communication service

It is a technology for operation support system and mobile communication business. It is applied in the direction of wireless communication, electrical components, radio/inductive link selection and arrangement, etc. It can solve the problem that there is no unified standard for performance test test design and test plan, and it is difficult for the person in charge of the test. Uniform writing of test designs and cases, test results are not comparable, etc.

Inactive Publication Date: 2007-07-04
CHINA MOBILE GROUP SHAIHAI
View PDF0 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] There are two disadvantages in this kind of performance test: one is that each person in charge of the test has different test experience and has different ideas for each performance test, so there is no unified test design and test plan for each performance test. Standard Specification
Second, due to the different test standards each time, there is no comparability bet

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method of operation support system performance testing of mobile communication service
  • Method of operation support system performance testing of mobile communication service

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0028] Embodiments of the present invention are further described below in conjunction with the accompanying drawings:

[0029] 1. BOSS system performance test requirements classification details

[0030] Since the BOSS system was officially launched, it has undergone several performance tests, including "BOSS system data domain integration performance test requirements", "BOSS system middleware upgrade performance test requirements", and "BOSS system database upgrade performance test requirements". No matter what kind of performance test requirements, it can be divided according to the performance test requirements from three aspects: test type, test scope, and observation indicators.

[0031] See Table 1 below:

[0032] Types of

Test Range

Test object

Test Methods

load test

front desk

Browser / Server Architecture

a

Client / Server Architecture

b

middleware

Browser / Server Architecture

c

Client / S...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a method for testing the support system of mobile communication service, wherein it comprises mobile service support system, mobile sell service support system, mobile group service support system, mobile personal large-client system, and database. And the invention is characterized in that: the testing method comprises load test, strength test, capacity test, while the test range is divided into forward table, middle element and database. The invention provides a testing method which can be used in RMOSS, BBOSS, PRM systems, and it can obtain the test data and analysis via inquires.

Description

technical field [0001] The invention relates to a mobile communication service operation support system, in particular to a method for performance testing of the mobile communication service operation support system. technical background [0002] Three systems currently used in mobile communications: Retail Business & Operation Support System (hereinafter referred to as RBOSS system), business operation support system (Business Business & Operation Support System, hereinafter referred to as BBOSS system), personal key customer system (PersonalRelation Management (hereinafter referred to as PRM system) performance test is written by each test leader based on his own performance test experience to write the test design and case, and then the tester executes it, and finally compares the test result data to analyze whether the system under test is in line with the normal system performance indicators in the state. [0003] There are two disadvantages in this kind of performance...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): H04Q7/34H04W24/08
Inventor 咸洁敏
Owner CHINA MOBILE GROUP SHAIHAI
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products