Train handling rules compliance system
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Benefits of technology
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0008]Referring now to the drawings, wherein like reference numerals refer to like parts throughout, there is seen in FIG. 1 a train handling rules compliance system 100 comprising an onboard subsystem 102 that is programmed to determine whether the operation of the train is in compliance with applicable train handling rules. Onboard subsystem 102 may be provided in combination with or as part of a train control system 112, such as the LEADER train control system available from New York Air Brake LLC of Watertown, New York. Onboard subsystem 102 is configured to receive or obtain data representing the state of the locomotive from train control system 112 and / or other sources, such as an engineer, using that data as well as locally stored data to determine whether a non-compliant event has occurred. Onboard subsystem 102 is further in communication with an off-board subsystem 104 and is programmed to transmit data surrounding any non-compliance events to off-board subsystem 104. Onbo...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

