An engineering progress management system

A progress management and engineering technology, applied in the direction of data processing applications, instruments, resources, etc., can solve the problems of delay in obtaining management information, failure to reflect progress to managers, waste of paper, etc.

Inactive Publication Date: 2008-09-10
GUANGDONG GOSUN TELECOMM
View PDF0 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In the past, most of the project management methods used the backward management method of paper report management, which caused a series of disadvantages such as serious waste of paper, low management efficiency, and lagging in the acquisition of management information.
This method cannot reflect the progress to the management personnel in real time, resulting in the failure of the project to be completed normally due to various reasons

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • An engineering progress management system
  • An engineering progress management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0018] The present invention will be further described below in conjunction with the accompanying drawings.

[0019] The schematic diagram of the module structure of the present invention is as attached figure 1 As shown, the system adopts b / s mechanism and three-layer structure. According to the requirements of system functions, it is divided into user information management module, data management module, data query statistics module, and data relationship coordination module. of.

[0020] Among them, the user information management module is mainly responsible for the management of user information and the verification of login information, laying the foundation for the application of other modules. The data management module is mainly for the tower connection between the front-end data entry, modification, and deletion operations and the back-end database, and it is the data center of the entire system. The data query statistics module is mainly responsible for informati...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provide a project schedule management system, comprising a data management module, a data inquiry statistic module, a data relation coordinating module and a user information management module. The system is mainly used for the tracking and controlling in each section by engineering project managing personnel, and for organizing, guiding, coordinating and supervising supervision departments, construction departments and relevant departments to in time carry out effective measures to regulate the project schedule plan. The invention provides an effective platform for dealing with various project failures of a project and each section work of a complicated project and enhancing the work efficiency of the project, thus greatly enhancing the work efficiency of project personnel and management personnel, fully realizing electronic inspection, and meeting the informatization management requirement.

Description

technical field [0001] The invention relates to the field of project progress monitoring of a mobile project management center, and belongs to electronic project management. Background technique [0002] Whether the mobile base station project can be successfully completed within the scheduled time is directly related to the economic benefits of the mobile project. The goal of progress control is opposite to that of investment control and quality control. Generally speaking, a fast progress will increase investment, but an early construction period will also increase investment benefits; fast progress may affect quality, and strict quality control may affect schedule; but if quality control is tight and rework is avoided, schedules can be accelerated. The three goals of progress, quality and investment are a system, and project management is to resolve the contradictions between the three. It requires fast progress, low investment and good quality. [0003] Therefore, it i...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/00G06Q50/00G06Q10/06G06Q50/30
Inventor 翁南凯张立王振勇舒海燕许开奇
Owner GUANGDONG GOSUN TELECOMM
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products